【Indonesia’s Kideco Deploys 18 Electric Mining Trucks, Projects Around 30% Lower Fleet Operating Costs】

Published: Sep 9, 2026 14:14
Indonesia’s Kideco has deployed 18 electric mining trucks at its East Kalimantan mining operations, supported by three battery swapping stations. The project is being implemented with invi, an Indika Energy subsidiary, following trials that began in 2024 and an initial deployment of six trucks during March–July 2026. According to the article’s main text, the electric trucks are projected to reduce energy consumption by up to 50% and operating costs by around 30% compared with the diesel fleet. The project could improve mine transport efficiency, but these reductions remain projections.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Steel] Turkish Billet Diverges: Domestic Prices Rise on Rebar as Heavy Restocking Curbs Import Buying
18 mins ago
[SMM Steel] Turkish Billet Diverges: Domestic Prices Rise on Rebar as Heavy Restocking Curbs Import Buying
Read More
[SMM Steel] Turkish Billet Diverges: Domestic Prices Rise on Rebar as Heavy Restocking Curbs Import Buying
[SMM Steel] Turkish Billet Diverges: Domestic Prices Rise on Rebar as Heavy Restocking Curbs Import Buying
[Turkey] On the domestic front, effectively buoyed by the continuous rally in domestic rebar prices, local steel billet prices remained firm, with domestic quotes rising by 5 USD/tonne to 550 USD/tonne ex-works. In contrast, the import market fell into a supply-demand tug-of-war. Supported by strengthening coking coal costs and robust domestic demand in major exporting nations (such as China and India), overseas sellers showed strong resolve to raise prices. Offers for Chinese resources climbed to 515–520 USD/tonne CFR, significantly slowing the pace of procurement. The primary reason buyers are staying on the sidelines is that Turkish mills had already secured a concentrated 250,000 to 300,000 tonnes of billet cargoes from China, India, and Malaysia in August. With extremely ample short-term spot reserves, buyers are expected to lack the appetite to chase high prices, bringing overall import trading to a near standstill.
18 mins ago
【Indonesia’s West Nusa Tenggara Plans Solar Replacement for Six Small Coal Plants, with No Implementation Timetable】
23 mins ago
【Indonesia’s West Nusa Tenggara Plans Solar Replacement for Six Small Coal Plants, with No Implementation Timetable】
Read More
【Indonesia’s West Nusa Tenggara Plans Solar Replacement for Six Small Coal Plants, with No Implementation Timetable】
【Indonesia’s West Nusa Tenggara Plans Solar Replacement for Six Small Coal Plants, with No Implementation Timetable】
Indonesia’s West Nusa Tenggara province plans to convert six small coal-fired power plants on Lombok and Sumbawa islands into solar facilities. Proposed by state utility PT PLN, all conversion plans remain under technical assessment, with no implementation timetable established. The initiative excludes larger facilities such as the Jeranjang power plant in West Lombok. Separately, the provincial Energy and Mineral Resources Office said PLN had identified approximately 1.73 GW of renewable-energy potential, mainly solar and wind; this figure does not represent the capacity of the proposed replacement projects. Land availability remains the main obstacle, and development will require cooperation with investors.
23 mins ago
【Forge Resources Completes Underground Ramp at Colombia’s La Estrella Coal Project and Begins Crosscut Development】
24 mins ago
【Forge Resources Completes Underground Ramp at Colombia’s La Estrella Coal Project and Begins Crosscut Development】
Read More
【Forge Resources Completes Underground Ramp at Colombia’s La Estrella Coal Project and Begins Crosscut Development】
【Forge Resources Completes Underground Ramp at Colombia’s La Estrella Coal Project and Begins Crosscut Development】
Forge Resources announced on September 8 that it had completed the underground ramp to operational depth at its La Estrella coal project in Santander, Colombia, and was commencing crosscut development toward the coal seams. The crosscut will initially use a 12.4-square-metre support section before transitioning to a 9.0-square-metre section, which the company expects to accelerate subsequent advance. Forge Resources holds an 80% interest in project developer Aion Mining. According to the company, La Estrella is fully permitted and contains eight known seams of metallurgical and thermal coal.
24 mins ago
Indonesia’s Kideco has deployed 18 electric mining trucks at its East - Shanghai Metals Market (SMM)