Improved Eskom Generation Reduces Power-Reliability Risk for South African PGM Sector

Published: Sep 8, 2026 15:12

[SMM Flash] South Africa’s electricity system continued to show improved generation reliability through the winter period, according to a September 7 update from the Minerals Council South Africa. Eskom’s average Energy Availability Factor reached 75.6% in July before easing to 71.2% in August, with the decline largely attributed to increased planned maintenance rather than deteriorating generation performance. Electricity demand nevertheless remained weak, with August peak demand of 28,498 MW well below the 34,029 MW recorded in August 2021.

For South Africa’s electricity-intensive PGM mines, concentrators and smelters, improved power availability reduces the immediate risk of operating disruptions. However, the Minerals Council said electricity costs for the mining sector increased by approximately 1,185% between 2003 and 2025, underlining continued structural cost pressure despite better supply reliability. Improved generation therefore supports operational stability but does not remove electricity-price pressure on PGM margins.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Terra Metals Reports Strong New PGM Intercepts at Dante Project
25 mins ago
Terra Metals Reports Strong New PGM Intercepts at Dante Project
Read More
Terra Metals Reports Strong New PGM Intercepts at Dante Project
Terra Metals Reports Strong New PGM Intercepts at Dante Project
[SMM Flash] Terra Metals has reported further strong platinum-group-metal mineralisation from the Southwest Discovery at its Dante Project in Western Australia. The company’s September 8 ASX announcement included intersections of 14 m at 3.13 g/t 3E and approximately 80 m at 1.30 g/t 3E, adding to a growing body of drilling that has defined multiple near-surface PGM-copper-nickel sulphide zones at Southwest. The results remain exploration-stage intersections and do not represent reserves or future mine output. However, they strengthen the geological case for a sizeable polymetallic PGM system outside the traditional South African, Russian and Zimbabwean producing regions. Terra Metals is continuing drilling and resource definition work at Southwest, meaning any eventual contribution to global PGM supply will depend on resource conversion, economic studies, permitting and development.
25 mins ago
Platinum maintains a consolidation pattern as longs and shorts intertwine, with cautious trading in the spot market [SMM Daily Commentary]
3 hours ago
Platinum maintains a consolidation pattern as longs and shorts intertwine, with cautious trading in the spot market [SMM Daily Commentary]
Read More
Platinum maintains a consolidation pattern as longs and shorts intertwine, with cautious trading in the spot market [SMM Daily Commentary]
Platinum maintains a consolidation pattern as longs and shorts intertwine, with cautious trading in the spot market [SMM Daily Commentary]
3 hours ago
Zimplats Eases Zimbabwe Export-Surrender Payment Backlog Through Government Offset Deal
21 hours ago
Zimplats Eases Zimbabwe Export-Surrender Payment Backlog Through Government Offset Deal
Read More
Zimplats Eases Zimbabwe Export-Surrender Payment Backlog Through Government Offset Deal
Zimplats Eases Zimbabwe Export-Surrender Payment Backlog Through Government Offset Deal
[SMM Flash] Zimplats has made significant progress in recovering delayed payments under Zimbabwe’s export-surrender regime after reaching an offset arrangement with government institutions, according to comments by Implats CFO Meroonisha Kerber during the group’s FY2026 results call. Under the surrender policy, exporters receive 70% of export proceeds in US dollars and 30% in local currency (ZiG). Delays in settling the local-currency component had left Zimplats owed the equivalent of US$78.1 million at end-December 2025. Under a tripartite arrangement reached around March, Zimplats now receives 50% of its surrender proceeds in cash while the remaining 50% can offset government obligations. The company has since used about US$99 million against taxes, royalties and customs duties and gained access to roughly US$150 million in local currency, bringing local creditors up to date. The arrangement reduces working-capital pressure at a major Zimbabwean PGM producer, although it does not represent a change to the underlying 70:30 export-surrender policy.
21 hours ago
[SMM Flash] South Africa’s electricity system continued to show impro - Shanghai Metals Market (SMM)