[SMM Computing Power Midday Review] H100 highest price in the Yangtze River Delta rises again, inference demand warming transmits to the leasing side

Published: Sep 8, 2026 11:42
Today, only the H100 Yangtze River Delta index adjusted: the highest monthly rental rose 2.41% to 85,000 yuan, and the average monthly rental rose 1.24% to 81,500 yuan. Demand-side signals: rising inference demand is driving up computing power prices around major cities. A leading large-model application tightened free usage for C-end users (after reaching peak capacity, it waited a week and did not reopen new user subscriptions), and H100 prices in areas near Beijing are expected to rise to 90,000 yuan per unit per month. C-end inference volume growth has become a new source of growth, and areas around first-tier cities may form price highlands, with the price increase cycle perhaps just beginning.

[Market Overview] The SMM computing power rental price index rose locally today. Among the 19 indices, only the H100 Yangtze River Delta index adjusted, while all others remained unchanged. On the demand side, sentiment showed noteworthy growth: computing power prices around major cities continued to rise, driven mainly by warming inference demand. A leading large-model application tightened free usage for C-end users, further widening the computing power gap.

[H100 Yangtze River Delta: Highest Price Up 2.41%] The highest monthly rent for the SMM-H100-80G full server in the Yangtze River Delta rose from 83,000 yuan to 85,000 yuan, an increase of 2,000 yuan, or 2.41%. The highest per-card hourly rate rose from 14.41 yuan to 14.76 yuan, up 2.43%. The average monthly rent also rose to 81,500 yuan, up 1.24%.

The highest price for the H100 in the Yangtze River Delta continued to climb early this week. Combined with the overall upward shift in the western region last week, high-end model quotes showed strength across multiple points.

[Demand Side: Inference Demand Warms, Beijing Area Seen Rising to 90,000] Market sentiment shows that computing power prices around major cities continue to rise, mainly due to rising inference demand. A leading large-model application has tightened free usage for C-end users. Free users who reach their usage peak must wait one week before continuing use, and new user subscriptions have not yet been opened. The robust C-end inference demand is evident. Market sources say the rental price for H100s in areas near Beijing is expected to rise to 90,000 yuan per unit per month. If realized, this would set a new high for H100 monthly rent.

[SMM View] Today's signals focus on strengthening demand-side logic. First, C-end inference volume is becoming a new source of computing power demand growth. Leading applications are managing computing power shortages through queuing and rate limiting, indicating that inference-side supply is approaching saturation. Demand spillover will directly push rental prices higher. Second, the rise in the highest H100 price in the Yangtze River Delta and the expected rise to 90,000 yuan near Beijing corroborate each other. Areas around first-tier cities where large-model applications cluster are forming computing power price highlands. Third, combined with last week's sellout of 5090 full servers and the absence of discounts for H200 over long cycles, high-end and consumer-grade spot supply are tightening simultaneously. SMM believes the price increase cycle driven by inference demand may have just begun. Close attention should be paid to whether H100 quotes around first-tier cities can hold above the 90,000 yuan mark.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Flash] Langfang City establishes a four-voucher linkage system of "computing power vouchers + token vouchers + data vouchers + model vouchers"
3 hours ago
[SMM Flash] Langfang City establishes a four-voucher linkage system of "computing power vouchers + token vouchers + data vouchers + model vouchers"
Read More
[SMM Flash] Langfang City establishes a four-voucher linkage system of "computing power vouchers + token vouchers + data vouchers + model vouchers"
[SMM Flash] Langfang City establishes a four-voucher linkage system of "computing power vouchers + token vouchers + data vouchers + model vouchers"
Langfang NDRC solicited public comments on September 4 regarding the "Four Measures to Guide the Innovative Development of the Computing Power Industry," establishing a multi-voucher linked policy system of "computing power vouchers + token vouchers + data vouchers + model vouchers" to guide computing power in empowering the real economy. [Data] - Computing power vouchers: no more than 10 million yuan allocated annually, subsidizing 50% of computing power resource costs, with a maximum of 1 million yuan per unit per year - Token vouchers: no more than 4 million yuan annually, supporting token factories/platforms, with a maximum of 1 million yuan per entity - Data vouchers: no more than 2 million yuan annually, supporting corpus/dataset development - Model vouchers: included in the multi-voucher system (specific amounts to be supplemented) - Comment solicitation period: 2026-09-04 to 2026-10-03 [SMM Comment] Viewpoint: The four-voucher linkage extends subsidies from "computing power usage" to the entire chain of "data/models/tokens," reducing the comprehensive cost of AI applications and stimulating small and medium-sized enterprises to adopt cloud services and utilize data. Impact pathway: subsidies → increased computing power demand from SMEs → improved regional computing power absorption. Comparative factors: Heilongjiang computing power vouchers (deduction ≤50%, maximum 4 million yuan per year, issued on April 23) and Guizhou computing power vouchers 3.0 (30%) create regional investment competition. Key data: computing power vouchers at 50%/10 million yuan.
3 hours ago
[SMM Flash] Gui'an New Area Issues the Three-Year Action Plan for "China Data Valley · Ciyuan City" (2026–2028)
3 hours ago
[SMM Flash] Gui'an New Area Issues the Three-Year Action Plan for "China Data Valley · Ciyuan City" (2026–2028)
Read More
[SMM Flash] Gui'an New Area Issues the Three-Year Action Plan for "China Data Valley · Ciyuan City" (2026–2028)
[SMM Flash] Gui'an New Area Issues the Three-Year Action Plan for "China Data Valley · Ciyuan City" (2026–2028)
Guiyang City/Gui'an New Area issued on September 2 the Three-Year Action Plan for Building China's Data Valley and Token City (2026-2028), promoting the upgrade of intelligent computing centers from "bare computing power services" to "standardized token production services." Newly built intelligent computing centers must achieve an average PUE of no higher than 1.2 and a green electricity share exceeding 80%. [Data] - Average PUE of newly built intelligent computing centers: ≤ 1.2 - Green electricity share: > 80% - Direction: Build large-scale, intensive "token factory" clusters, expanding intelligent computing center operations toward directly callable token production services - Supporting measures: Support China Southern Power Grid's computing-power coordination pilot and the "Gui'an New Area Electricity-Computing Coordination Industry Alliance," promoting direct green electricity supply and green electricity trading [SMM Comment] Viewpoint: Local authorities have incorporated the "token economy" into a three-year action plan, shifting computing power policy from "building scale" to "promoting utilization and reducing energy consumption." Impact pathway: Front-loaded PUE/green electricity constraints → driving liquid cooling plus direct green electricity supply → lower unit computing power costs. Comparative factors: Continuing the subsidy plus green electricity mainline seen in the Sichuan computing power network on September 5 (computing vouchers at 40%) and Guizhou computing vouchers 3.0 on September 3 (intelligent computing incentives at 30%), this plan further sets "token factories" as a construction goal. Key data: PUE ≤ 1.2, green electricity > 80%.
3 hours ago
[SMM Computing Power Daily] Northwest 256 H200 units, five-year closed contract at 128,000
20 hours ago
[SMM Computing Power Daily] Northwest 256 H200 units, five-year closed contract at 128,000
Read More
[SMM Computing Power Daily] Northwest 256 H200 units, five-year closed contract at 128,000
[SMM Computing Power Daily] Northwest 256 H200 units, five-year closed contract at 128,000
Summary: On September 7, 256 H200 full servers were released as five-year closed-end long-term leases in north-west China, with a monthly rent of 128,000 yuan per unit, higher than quotes for the same term in central China and showing no discount on the long-term contract side, reflecting stronger seller pricing power; 5090 bulk supply ramped up from hundreds to thousands of units, with 800 8-GPU server leases absorbing demand from carriers; Dell B300 futures were quoted at 8.05–8.6 million yuan for 3T and 8.9 million yuan for 4T, while spot-side demand for hundreds of units appeared for the first time; H100 actual purchase orders of 80 units and 128-unit five-year closed-end deals coexisted; 910B2 online leasing was quoted at 17,000 yuan, a new high for that model.
20 hours ago