[SMM Flash News] China's Lithium Sulphide Production Scales Up; Q4 Growth Expected to Remain Moderate

Published: Sep 7, 2026 18:34

China produced 7.79 tonnes of battery-grade lithium sulphide in August 2026, up 3.6% month-on-month and 143% year-on-year. Production for the first eight months of 2026 reached 52.9 tonnes, surpassing the 34 tonnes produced globally in all of 2025. China accounted for roughly 95% of global lithium sulphide output as of August 2026.

Q4 2026 production is projected to rise to 9-10 tonnes per month, a 15-25% increase from Q3's roughly 8 tonnes per month, bringing full-year 2026 output to a projected 85-95 tonnes.

Lithium sulphide serves as a cathode material or precursor for high energy-density batteries and as a raw material for sulphide-based solid electrolytes in next-generation solid-state batteries. Leading battery manufacturers have not yet entered large-scale procurement cycles for sulphide electrolytes; broader commercial deployment of sulphide-based all-solid-state batteries is projected for 2028–2030. China completed its first test of a sulphide-based all-solid-state battery in early August 2026.

Global lithium demand is forecast to grow more than 11% annually through 2031, driven by EV adoption and battery energy storage system (BESS) deployment, according to Australia's Department of Industry, Science and Resources.

Andrada Mining (AIM:ATM) holds three lithium-related assets in Namibia: the Uis tin mine (19,700 hectares, hosting lithium, tin, tantalum, and rubidium-bearing pegmatites), the Lithium Ridge project, and the Brandberg West project.

Q2 Metals (TSX-V:QTWO) holds the Cisco Lithium Project in Québec, Canada, with a resource of 270 million tonnes (Mt) at 1.36% Li₂O plus an underground-constrained resource of 24Mt at 1.34% Li₂O. A 2026 summer drill program returned intersect-ions of 60.8m at 1.24% Li₂O, 213.8m at 1.93% Li₂O, and 403.7m at 1.57% Li₂O.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
13 mins ago
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
Read More
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
[SMM News] Sibanye-Stillwater's Keliber Lithium Hydroxide Project Advances to Staged Production in Finland
13 mins ago
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
14 mins ago
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
Read More
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
[SMM News] Zimbabwe's Mining Investment Appeal Hinges on Stability, Infrastructure and Lithium Beneficiation Push
Zimbabwe's ability to attract and retain mining investment depends on maintaining economic stability, infrastructure development and access to long-term capital, according to Stanbic Bank Zimbabwe mining and metals VP Tania Mandaza. Zimbabwe's lithium export restrictions, aimed at encouraging domestic processing, are already influencing investor capital allocation. Beneficiation requires higher upfront capital than raw ore export, and the policy is expected to encourage consolidation, with smaller miners pursuing toll-processing arrangements, joint ventures or acquisitions with larger operators. Stanbic Bank Zimbabwe funds mine development and processing plants, including lithium facilities, ferrochrome smelters and PGM refineries, and participates in syndicated financing, trade finance, guarantees, letters of credit and working-capital facilities. Demand for longer-tenor structured project finance is rising, with some projects requiring terms of up to seven years strongest currently for gold mine expansions on higher gold prices, alongside growing requests for processing-plant financing. Power supply security remains a key focus for the sector. The government has directed miners to develop their own power solutions, and the bank is funding renewable-energy transactions as well as public-private partnerships for rail and logistics revival. Beyond lithium, Mandaza cites PGMs, gold, chrome and nickel as offering investment opportunities, with rare earths a longer-term prospect. Nickel demand is being driven by EV and battery markets. Zimbabwe's gold output rose from 38.5 t in 2024 to 50.5 t in 2025, with about 55 t targeted this year; gold prices near $4,000/oz are drawing investor interest in local assets. Proposed reforms the Mines and Minerals Bill and a digital mining permit system aim to provide regulatory certainty on mining rights, taxation, foreign-currency rules and export policy. ESG requirements, spanning green energy, water and tailings management, emissions, community development and governance, are increasingly factored into financing decisions. Chinese investment is expected to remain significant in Zimbabwe's lithium sector, with additional interest emerging from the Middle East, the Americas and India, as investors broaden into processing and manufacturing to secure critical mineral supply chains. The export restrictions are reshaping Zimbabwe's position in the global spodumene supply chain: raw concentrate available for export is constrained near-term as beneficiation capacity develops, while the country's export profile is expected to shift toward higher value processed lithium products over time.
14 mins ago
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
15 mins ago
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
Read More
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
[SMM News] Anson Resources Secures $193M Utah Incentive for Green River Lithium Project
On September 4th, ASX-listed Anson Resources has secured a $193 million business incentive from the Utah Inland Port Authority (UIPA) for its Green River lithium project, granted to subsidiary A1 Lithium. The incentive will be paid as a tax rebate over Green River's 20-year operating life, roughly $8 million a year, based on projected property tax revenue. UIPA has also offered an alternative bond-based structure to finance public infrastructure power, water, gas, rail and road upgrades needed to support the project. A combination of both options is possible, and Anson is exploring these structures as infrastructure upgrades are required for the planned 10,000 t/y lithium carbonate plant at Green River, which a March scoping study estimated at $569 million in total capital investment. The UIPA approval is separate from Anson's pending application to Utah's Governor's Office of Economic Development (GOED) for tax reduction support, due to be considered at GOED's September 10 board meeting. Anson said the incentive marks progress in assembling Green River's finance stack, as it continues pursuing pre-production financing options aimed at limiting shareholder dilution while supporting debt and strategic investment.
15 mins ago