Enamelled Wire Industry Sees 67.95% Operating Rate in August 2026, Down MoM but Up YoY

Published: Sep 4, 2026 10:32
According to SMM, the overall operating rate of the enamelled wire industry in August 2026 was 67.95%, down 2.02 percentage points MoM and up 1.4 percentage points YoY. Among them, the operating rate of large enterprises was 71.87%, that of medium-sized enterprises was 56.95%, and that of small enterprises was 67.38%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Flash | Chile's July Imacec Falls 1.5% YoY, Steepest Monthly Drop Since 2022 as Mining Slumps 9.3%]
1 hour ago
[Flash | Chile's July Imacec Falls 1.5% YoY, Steepest Monthly Drop Since 2022 as Mining Slumps 9.3%]
Read More
[Flash | Chile's July Imacec Falls 1.5% YoY, Steepest Monthly Drop Since 2022 as Mining Slumps 9.3%]
[Flash | Chile's July Imacec Falls 1.5% YoY, Steepest Monthly Drop Since 2022 as Mining Slumps 9.3%]
Chile's central bank reported on September 1 that the July Imacec economic activity index fell 1.5% year-on-year on an unadjusted basis. On a seasonally adjusted basis, the index fell 2.1% year-on-year and 1.7% month-on-month, marking the steepest monthly decline since 2022. The bank attributed the drop mainly to mining, which fell a significant 9.3%, primarily due to weather conditions, followed by lower ore grades and equipment maintenance that disrupted normal production operations. Many of the affected mines are copper-molybdenum associated deposits. Since molybdenum concentrate is recovered as a byproduct of the flotation process used to treat copper sulfide ore, the disruption to processing plants also curtailed molybdenum output.
1 hour ago
Anax Launches Whim Creek Heap-Leach Feasibility Study After Copper Recoveries Reach 77–80%
1 hour ago
Anax Launches Whim Creek Heap-Leach Feasibility Study After Copper Recoveries Reach 77–80%
Read More
Anax Launches Whim Creek Heap-Leach Feasibility Study After Copper Recoveries Reach 77–80%
Anax Launches Whim Creek Heap-Leach Feasibility Study After Copper Recoveries Reach 77–80%
Anax Metals has launched a heap-leach feasibility study at its Whim Creek copper-zinc project in Western Australia, assessing a second processing route alongside its planned concentrator. Recent CSIRO column tests achieved 77–80% copper extraction and more than 90% zinc extraction from lower-grade ores. The study, targeted for completion in Q1 2027, will evaluate the potential production and marketing of copper cathode from the existing permitted heap-leach and SX-EW infrastructure.
1 hour ago
Weak New Orders Downstream; Copper Rod Enterprises Cut Production and Destock [SMM Copper Cathode Rod Weekly Review]
1 hour ago
Weak New Orders Downstream; Copper Rod Enterprises Cut Production and Destock [SMM Copper Cathode Rod Weekly Review]
Read More
Weak New Orders Downstream; Copper Rod Enterprises Cut Production and Destock [SMM Copper Cathode Rod Weekly Review]
Weak New Orders Downstream; Copper Rod Enterprises Cut Production and Destock [SMM Copper Cathode Rod Weekly Review]
1 hour ago