Fed's Waller Sees Reasonable Inflation, Hints at Patience; Gold Rises, Dollar Falls

Published: Sep 04, 2026 09:14 (GMT+8)
[SMM Precious Metal Express] Fed Governor Waller said that next month's CPI and PPI are expected to be at "reasonable levels," and the current rate setting could bring inflation back to the 2% target, suggesting waiting for another meeting before deciding. Markets interpreted this as dovish, with traders trimming September rate hike odds from 63% to 60%. The dollar fell 0.56%, Treasury yields dropped across the curve, and spot gold rose approximately 2%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Côte d’Ivoire’s Koné Mine Makes First Gold Pour
2 hours ago
Côte d’Ivoire’s Koné Mine Makes First Gold Pour
Read More
Côte d’Ivoire’s Koné Mine Makes First Gold Pour
Côte d’Ivoire’s Koné Mine Makes First Gold Pour
[SMM Gold Flash] Montage Gold reported a first gold pour at its Koné mine in Côte d’Ivoire on 26 September, yielding approximately 1,140 ounces. Announcing the milestone on 27 September, the company said more than 400,000 tonnes of ore had passed through the oxide circuit since feed began on 8 September. The pour came ahead of the mine’s original second-quarter 2027 target following early completion of that circuit. The pour establishes that gold has been produced, but it does not establish commercial production or a sustained production rate. Montage expects the oxide circuit to reach commercial production in the fourth quarter of 2026. Its separate hard-rock comminution circuit remains under construction, with completion targeted for the second quarter of 2027. Koné’s contribution to Côte d’Ivoire’s supply will depend on how those circuits ramp up.
2 hours ago
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Sep 25, 2026 16:02 (GMT+8)
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Read More
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
Tanzania’s Imwelo selects processing route after gold recovery rises to 84.5%
[SMM Gold Flash] Lake Victoria Gold reported new metallurgical testwork for weathered ore at Area C of its fully permitted Imwelo Gold Project in Tanzania. Attrition scrubbing followed by desliming increased 24-hour gold extraction from 49.99% to 84.54% in agitated-leach testing. Bottle-roll recovery reached 88.15% after pretreatment, while gravity-recoverable gold also increased. The work was conducted by Nesch Mintech Tanzania in Mwanza. The company has identified attrition scrubbing and desliming as the preferred pretreatment route for further optimisation of the clay-rich near-surface material. Lake Victoria Gold says the results complement earlier work on deeper material, where recoveries of approximately 96–97% were reported. Importantly, the reported recoveries relate to tested pretreated fractions and do not yet represent overall whole-ore plant recovery; further mass-balance and optimisation work is planned.
Sep 25, 2026 16:02 (GMT+8)
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Sep 25, 2026 15:58 (GMT+8)
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Read More
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
Aurum drilling delivers 155 g/t gold hit at Côte d’Ivoire’s Boundiali
[SMM Gold Flash] Aurum Resources reported new assay results from 22 diamond holes totalling 6,172.8 metres at the BST1 deposit at its Boundiali Gold Project in Côte d’Ivoire. The results include 2.63 metres at 76.74 g/t gold from 195.2 metres, including 1.3 metres at 155 g/t, together with 24 metres at 6.31 g/t from 108 metres, including 7 metres at 19.25 g/t. Several intersections extend beyond the existing BST1 resource envelope. The results will feed into Aurum’s planned Boundiali Mineral Resource update targeted for early Q4 2026. The company says mineralisation remains open along strike and at depth, while drilling continues across the project. The results are therefore an exploration and resource-growth development rather than additional production. Boundiali currently has a 3.22-million-ounce JORC Mineral Resource, while Aurum is advancing a definitive feasibility study.
Sep 25, 2026 15:58 (GMT+8)