U.S. Battery Storage Averaged 70% Annual Growth Over Past Three Years, EIA Reports

Published: Aug 31, 2026 18:41 (GMT+8)
U.S. utility-scale battery storage capacity has expanded at an annual average rate of 70% over the last three years, according to the Energy Information Administration's (EIA) latest generator inventory data released on August 7, 2026. By the end of 2025, the U.S. power grid had 43.6 GW of operational battery storage. Operators added another 8.3 GW during the first half of 2026, bringing total installed capacity to nearly 52 GW. Looking ahead, developers anticipate bringing an additional 54 GW online over the next two and a half years, with 14 GW slated for the second half of 2026, 26 GW in 2027, and 14 GW in 2028. The EIA notes that battery deployment continues to track closely with solar buildout, absorbing daytime generation surpluses and discharging during evening peaks.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Energy storage: Sungrow, CATL among five winners of CNNC 2.98GWh storage procurement]
Oct 16, 2026 14:03 (GMT+8)
[Energy storage: Sungrow, CATL among five winners of CNNC 2.98GWh storage procurement]
Read More
[Energy storage: Sungrow, CATL among five winners of CNNC 2.98GWh storage procurement]
[Energy storage: Sungrow, CATL among five winners of CNNC 2.98GWh storage procurement]
CNNC announced winners of its 2026-2028 LFP energy storage system centralized procurement on October 14. Sungrow, CATL, Zhongtian Energy Storage, CRRC Zhuzhou Institute and Kehua won with bids of RMB 0.4995-0.5329/Wh. The 2.98GWh tender attracted 33 bidders, covering 2-hour and 4-hour systems with a 1500V DC design and requirements for grid services such as primary frequency regulation and reactive power support.
Oct 16, 2026 14:03 (GMT+8)
[Energy storage: HiTHIUM cumulative shipments top 200GWh, Chongqing long-duration line supports delivery]
Oct 16, 2026 14:03 (GMT+8)
[Energy storage: HiTHIUM cumulative shipments top 200GWh, Chongqing long-duration line supports delivery]
Read More
[Energy storage: HiTHIUM cumulative shipments top 200GWh, Chongqing long-duration line supports delivery]
[Energy storage: HiTHIUM cumulative shipments top 200GWh, Chongqing long-duration line supports delivery]
HiTHIUM held a 200GWh shipment milestone ceremony in Chongqing on October 15, doubling from 100GWh in just over a year and rising to No.2 globally in 2025 from fifth in 2023. Its Chongqing plant runs the world's first dedicated long-duration storage cell line, rolling out 200 kAh-class cells per hour with over 89% automation, and was named a WEF Lighthouse Factory in January. Since settling in Tongliang, the company has drawn 18 upstream and downstream firms, generating RMB 10.85 billion in output in January-September, up 54% YoY.
Oct 16, 2026 14:03 (GMT+8)
[Energy storage: LONGi starts production at Suzhou base, grid-scale integration capacity targeted at 50GWh]
Oct 10, 2026 19:47 (GMT+8)
[Energy storage: LONGi starts production at Suzhou base, grid-scale integration capacity targeted at 50GWh]
Read More
[Energy storage: LONGi starts production at Suzhou base, grid-scale integration capacity targeted at 50GWh]
[Energy storage: LONGi starts production at Suzhou base, grid-scale integration capacity targeted at 50GWh]
LONGi's Suzhou base officially started production on Oct 9, covering containerized storage, C&I storage and control cabinets. Its grid-scale integration line will have 31GWh annualized capacity from October, expanding to 50GWh in 2027, plus over 10,000 C&I units per year by end-October. LONGi acquired control of Jingko Energy (about 62% voting rights) in Nov 2025; cumulative storage orders exceeded 3GWh in H1 2026, with a 6GWh shipment target for the full year.
Oct 10, 2026 19:47 (GMT+8)