Bulls Reduce Positions, SHFE Zinc Pulls Back Intraday [SMM Zinc Futures Brief Comment]

Published: Aug 27, 2026 18:15
[Bulls reduce positions; SHFE zinc pulls back intraday] The most-traded SHFE zinc 2610 contract opened at 26,460 yuan/mt. After the open, it drifted higher, hitting a session high of 26,745 yuan/mt, then pulled back, touching a low of 26,125 yuan/mt near the end, and eventually closed lower at 26,140 yuan/mt.....

SMM, August 27:

       the most-traded SHFE zinc 2610 contract opened at 26,460 yuan/mt. After opening, SHFE zinc drifted higher, hitting a high of 26,745 yuan/mt during the session, then continuously pulled back from highs. At the end of the session, SHFE zinc dipped to a low of 26,125 yuan/mt, finally closing down at 26,140 yuan/mt, down 290 yuan/mt or 1.1%. Trading volume increased to 160,000 lots, while open interest decreased by 3,058 lots to 166,000 lots. SHFE zinc recorded a bearish candlestick, with support from the 10-day moving average below. Fundamentally, the ore supply tightness persisted, and TCs continued to slide. However, domestic demand remained sluggish, and bulls reduced positions at highs, causing SHFE zinc to pull back notably during the session. It is expected to maintain a consolidation pattern in the short term.

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
North China Mine Maintenance to Cut Zinc Concentrate Output by 1,000 Tonnes in September
2 hours ago
North China Mine Maintenance to Cut Zinc Concentrate Output by 1,000 Tonnes in September
Read More
North China Mine Maintenance to Cut Zinc Concentrate Output by 1,000 Tonnes in September
North China Mine Maintenance to Cut Zinc Concentrate Output by 1,000 Tonnes in September
[Zinc Concentrate Production] According to SMM, a mine in North China plans to begin maintenance from late August for approximately 15 days. Zinc concentrate output is expected to decline by 1,000 metal tonnes month-on-month in September.
2 hours ago
North China Mine Maintenance to Affect Zinc Concentrate Output in August, Recovery Expected in September
2 hours ago
North China Mine Maintenance to Affect Zinc Concentrate Output in August, Recovery Expected in September
Read More
North China Mine Maintenance to Affect Zinc Concentrate Output in August, Recovery Expected in September
North China Mine Maintenance to Affect Zinc Concentrate Output in August, Recovery Expected in September
[Zinc Concentrate Production] According to SMM, a mine in North China plans to undergo routine maintenance in August, which will affect part of its ore output. Normal production is expected to resume in September, potentially bringing an incremental nearly 500 metal tonnes of zinc concentrate.
2 hours ago
Xiejiagou Lead-Zinc Flotation Plant Completes Ore-Feed Commissioning, Boosting Jinhui Mining's Capacity
2 hours ago
Xiejiagou Lead-Zinc Flotation Plant Completes Ore-Feed Commissioning, Boosting Jinhui Mining's Capacity
Read More
Xiejiagou Lead-Zinc Flotation Plant Completes Ore-Feed Commissioning, Boosting Jinhui Mining's Capacity
Xiejiagou Lead-Zinc Flotation Plant Completes Ore-Feed Commissioning, Boosting Jinhui Mining's Capacity
It is reported that the Xiejiagou Lead-Zinc Flotation Plant, a core supporting project of Jinhui Mining’s Jiangluo Mine with a designed processing capacity of 1.5 million tonnes per year, recently successfully completed ore-feed commissioning, marking a major milestone in the mine’s capacity development. The flotation plant was specifically constructed to support the Jiangluo Mine’s own mineral resources, with all feedstock sourced from the Xiangyangshan, Xiejiagou, and Yangjiashan lead-zinc mines within the mining area. Once operational, the plant will enable centralized and efficient processing of the mine’s own ore, significantly increasing the company’s ore-processing capacity and beneficiation efficiency while improving the overall utilization of mineral resources.
2 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
Bulls Reduce Positions, SHFE Zinc Pulls Back Intraday [SMM Zinc Futures Brief Comment] - Shanghai Metals Market (SMM)