South32’s FY26 results materials show that Cannington has an 11Mt underground Ore Reserve, extending reserve life to FY33. The operation also holds a 44Mt underground Mineral Resource and a 27Mt open-pit Mineral Resource, while underground and open-pit life-extension options continue to advance.
FY26 payable production at Cannington was 39.2kt of zinc, 82.9kt of lead and 8.906Moz of silver. On the FY26 realised-price basis, zinc-equivalent production was 290.0kt. South32 guides to approximately 290kt of zinc-equivalent production in both FY27 and FY28, supported by processing lower-grade stockpiles.
![Tianjin Zinc: Zinc Prices Continue to Surge, Market Trading Inactive [SMM Midday Review]](https://imgqn.smm.cn/usercenter/oTrxc20251217171755.jpg)
![Shanghai Zinc: SHFE Zinc Futures Prices Continue to Rise, Market Sentiment Sluggish [SMM Midday Review]](https://imgqn.smm.cn/usercenter/qTzTI20251217171754.jpg)

