[SMM News] US DOE Selects Nth Cycle for $100M Black Mass Refining Project to Boost Domestic Battery Recycling

Published: Aug 21, 2026 21:23 (GMT+8)

SMM, August 21: US-based critical minerals refiner Nth Cycle has been selected by the US Department of Energy to enter award negotiations for up to $100 million in funding to build a commercial-scale black mass refining facility, Project Shield, in the southeastern US one of the first of its kind domestically.

The facility will refine up to 24,000 t/y of domestic black mass, the material recovered from shredded spent lithium-ion batteries, into high-purity nickel MHP and battery-grade lithium carbonate using Nth Cycle's proprietary OYSTER electroextraction system. The award addresses a structural gap in US recycling capacity: following the US Department of Commerce's recent one-year export ban on black mass, insufficient domestic refining has left China dominant in its processing. Nth Cycle already holds a ten-year offtake term sheet with Trafigura for 2,000 t of contained nickel and 1,500 t of lithium carbonate, adding to its existing Ohio operations. Project Shield is targeted for 2029, aided by a modular build model roughly 70% less capital-intensive than traditional refineries.

SMM View: DOE backing for Nth Cycle reflects growing US urgency to build domestic lithium and nickel recycling capacity independent of Chinese midstream processing, with the black mass export ban tightening feedstock supply at home and locked-in offtake demand strengthening the case for battery recycling as a key pillar of western raw material security.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Li-ion: CATL starts trial cell production at Hungary plant, planned capacity 100GWh]
1 hour ago
[Li-ion: CATL starts trial cell production at Hungary plant, planned capacity 100GWh]
Read More
[Li-ion: CATL starts trial cell production at Hungary plant, planned capacity 100GWh]
[Li-ion: CATL starts trial cell production at Hungary plant, planned capacity 100GWh]
CATL announced on Sep 22 that its new cell plant in Debrecen, Hungary has officially started trial production, with the first two lines of the initial cell building coming online after all preconditions were met. The project, its second battery plant in Europe, was announced in Aug 2022, broke ground in summer 2023, obtained its usage permit in Aug 2026, and has produced 537,000 battery modules since autumn 2024. Once fully built, the 100GWh base will be CATL's largest manufacturing site outside China, supplying leading European automakers with EV capacity in Hungary.
1 hour ago
China, New Zealand Hold Second NEV Dialogue in Beijing, Strengthening Bilateral Cooperation
2 hours ago
China, New Zealand Hold Second NEV Dialogue in Beijing, Strengthening Bilateral Cooperation
Read More
China, New Zealand Hold Second NEV Dialogue in Beijing, Strengthening Bilateral Cooperation
China, New Zealand Hold Second NEV Dialogue in Beijing, Strengthening Bilateral Cooperation
[Second China-New Zealand NEV Dialogue Held in Beijing] On September 22, 2026, Wang Weiming, Chief Engineer of the Ministry of Industry and Information Technology, and Chris Nees, Deputy Secretary of New Zealand's Ministry of Urban, Environmental, Regional and Transport, co-chaired the second China-New Zealand NEV dialogue in Beijing. Wang Weiming stated that establishing the NEV dialogue mechanism is a pragmatic measure to implement the important consensus reached by the leaders of China and New Zealand. The two sides jointly held the first China-New Zealand NEV dialogue in Wellington, New Zealand, last December, laying an important foundation for industrial cooperation between the two countries. The Ministry of Industry and Information Technology is willing to continue strengthening dialogue and exchanges in the NEV field with New Zealand's Ministry of Urban, Environmental, Regional and Transport. Chris Nees stated that the NEV dialogue mechanism has established an important platform for policy exchanges between New Zealand and China in the NEV field, and New Zealand is willing to continue cooperation with China's Ministry of Industry and Information Technology under this mechanism. Heads of relevant departments and bureaus of the Ministry of Industry and Information Technology attended the dialogue.
2 hours ago
Bridge Green, Hartree Sign USD 500M+ Recycled Lithium Supply Deal, ~10Kt/yr
2 hours ago
Bridge Green, Hartree Sign USD 500M+ Recycled Lithium Supply Deal, ~10Kt/yr
Read More
Bridge Green, Hartree Sign USD 500M+ Recycled Lithium Supply Deal, ~10Kt/yr
Bridge Green, Hartree Sign USD 500M+ Recycled Lithium Supply Deal, ~10Kt/yr
【Bridge Green and Hartree Sign USD 500M+ Recycled Lithium Supply Agreement, ~10,000 Tonnes of Lithium Carbonate Per Year】US battery recycling company Bridge Green Upcycle and commodity trader Hartree Partners have signed an exclusive marketing and supply agreement, under which Hartree will obtain exclusive marketing rights for lithium carbonate produced by Bridge Green, with annual offtake of approximately 10,000 tonnes. The agreement has an initial term of 8 years, renewable for 7 years, with an estimated value of USD 500 million to USD 1 billion at current market conditions, with first deliveries expected in 2028. Bridge Green's India recycling center commenced operations in Q2 2026, with an annual lithium battery processing capacity of approximately 7,200 tonnes.
2 hours ago