A Company in Hunan Today Bids for 800 mt in Physical Content of Bismuth Concentrates for August Delivery [SMM Bismuth Market Tracking Report]

Published: Aug 12, 2026 17:11 (GMT+8)

SMM News on August 12: According to official news from a Hunan-based company, the company started bidding today for the sale of its 800 mt in physical content of bismuth concentrates for August 2026. The deadline for registration and quotation is 15:30 on August 14. The quality specifications are 18% ≤ Bi < 45%, 15% ≤ H2O < 25%, Ag approximately 200-600 grams, and Au approximately 1.5 grams. The settlement quantity shall be based on actual on-site weighing. This batch of 800 mt in physical content of bismuth concentrates is currently at the company's storage center. According to official news, there will be two bidding sessions, with each session involving 400 mt in physical content. The settlement quantity for each session shall be based on actual on-site sampling and weighing. This bidding requires the winning party to pick up the goods within three working days after winning the bid. Currently, the bidding duration is only a short 2 days, and market participants speculate that the transaction probability is high.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Aterian reports higher Rwanda 3T ore sales; trading margins remain estimates
Oct 02, 2026 16:26 (GMT+8)
Aterian reports higher Rwanda 3T ore sales; trading margins remain estimates
Read More
Aterian reports higher Rwanda 3T ore sales; trading margins remain estimates
Aterian reports higher Rwanda 3T ore sales; trading margins remain estimates
[SMM Tantalum Flash] Aterian’s interim results, released on 30 September, show £1.341 million of Tantalum and other ore-sales revenue for the six months to 30 June 2026, up from £20,000 a year earlier. Gross profit was £522,000, while the group recorded a £568,000 pre-tax loss. Its Rwanda trading business deployed about US$2.18 million in working capital through joint-venture purchases. Management valued potential sales from those purchases at US$2.78 million, but cautioned that the notional valuation is not additional recognised revenue. The implied US$602,000 gross trading profit is also a management estimate, dependent on completed sales, assays, realised prices, costs and the joint venture’s profit allocation. Aterian said traceability inspections limited suppliers and volumes. It held £131,000 in cash at 30 June; its expectation of expanding trading volumes from the fourth quarter still depends on execution and funding.
Oct 02, 2026 16:26 (GMT+8)
[SMM Analysis] DRC Coltan in 2025: What Production and Export Data Reveal
Sep 29, 2026 21:40 (GMT+8)
[SMM Analysis] DRC Coltan in 2025: What Production and Export Data Reveal
Read More
[SMM Analysis] DRC Coltan in 2025: What Production and Export Data Reveal
[SMM Analysis] DRC Coltan in 2025: What Production and Export Data Reveal
The Democratic Republic of the Congo remains the world’s leading tantalum producer. The harmonised 2025 statistics used for this analysis report 1,434.17 tonnes of coltan, with 88.1% attributed to artisanal mining. They also reveal a supply chain concentrated in a few provinces and firms, wide export unit-value differences and official totals that do not fully agree. The central issue is therefore not only how much Congo produces, but how well each tonne is recorded from mine to export.
Sep 29, 2026 21:40 (GMT+8)
Sinomine Breaks Ground on Second Ta-Nb Recovery Plant at Bikita
Sep 28, 2026 15:55 (GMT+8)
Sinomine Breaks Ground on Second Ta-Nb Recovery Plant at Bikita
Read More
Sinomine Breaks Ground on Second Ta-Nb Recovery Plant at Bikita
Sinomine Breaks Ground on Second Ta-Nb Recovery Plant at Bikita
[SMM Tantalum Flash] Sinomine Resources said a groundbreaking ceremony for a second tantalum-niobium recovery plant took place at its Bikita operation in Zimbabwe on 25 September. The company says the plant is designed to treat 450,000 tonnes of ore a year and produce 500–600 tonnes of combined tantalum-niobium concentrate annually. It expects construction and commissioning in 2027; those volumes are design targets, not current output. The project would expand recovery of critical metals associated with Bikita’s lithium operation and add processing capacity in Zimbabwe. Sinomine plans to use magnetic separation and shaking tables to extract tantalum-niobium concentrate from lithium concentrate. The ceremony marks the project’s launch; completed construction, actual throughput and recovered volumes remain to be demonstrated.
Sep 28, 2026 15:55 (GMT+8)
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here