Emerita Resources expects to complete a prefeasibility study for its flagship Iberian Belt West (IBW) project in southern Spain in the third quarter of this year. IBW comprises the Infanta, El Cura and Romanera polymetallic deposits in the Iberian Pyrite Belt. The project hosts 18.9 million indicated tonnes grading 2.8% zinc and 1.42% lead, containing 547,000 tonnes of zinc and 269,000 tonnes of lead, alongside copper, gold and silver.
Inferred resources total 6.8 million tonnes grading 3.25% zinc and 1.5% lead, containing 221,000 tonnes of zinc and 102,000 tonnes of lead, together with copper, gold and silver. Emerita’s Spanish portfolio also includes the Aznalcollar and Nuevo Tintillo projects; Aznalcollar is a past-producing open-pit mine that the company is seeking to redevelop following a long-running ownership dispute.


![Exports Drive Destocking, SHFE Zinc Center Moves Upward [SMM Zinc Morning Comment]](https://imgqn.smm.cn/usercenter/kdRPs20251217171754.jpg)
