Winshear Reports Drill Results from the Rodburn Target, Portsoy Project, NE Scotland

Published: Aug 7, 2026 07:00
Winshear Metals has reported the latest drill results from the Rodburn target at its Portsoy project in northeast Scotland, further expanding the footprint of high-grade nickel-copper-cobalt mineralization. In the South Zone, drilling extended high-grade mineralization approximately 100 metres down dip. Drill hole RBD029 intersected 8.15 metres grading 0.77% nickel, 1.14% copper and 0.05% cobalt, including a higher-grade interval of 6.0 metres grading 0.98% nickel, 1.51% copper and 0.06% cobalt. A second hole, RBD030, intersected 4 metres grading 0.29% nickel and 0.18% copper further down dip. Downhole electromagnetic (DHEM) surveying also identified a strong conductive anomaly approximately 100 metres east of RBD030, which is interpreted to potentially represent a massive sulphide body and remains untested. In the North Zone, drilling extended mineralization approximately 100 metres to the west. Drill hole RBD028 intersected two mineralized intervals, grading 0.98% nickel, 0.14% copper and 0.045% cobalt over 3 metres, and 0.76% nickel, 0.32% copper and 0.034% cobalt over 4 metres, within a broader 16-metre mineralized zone averaging 0.39% nickel, 0.14% copper and 0.018% cobalt. The company said the latest drilling results have further expanded the extent of high-grade mineralization at the Rodburn target and confirmed the project's potential for further resource growth.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Manganese Ore Weekly Review] Manganese Ore Port Inventory Continues to Accumulate, Spot Prices Under Pressure
12 hours ago
[SMM Manganese Ore Weekly Review] Manganese Ore Port Inventory Continues to Accumulate, Spot Prices Under Pressure
Read More
[SMM Manganese Ore Weekly Review] Manganese Ore Port Inventory Continues to Accumulate, Spot Prices Under Pressure
[SMM Manganese Ore Weekly Review] Manganese Ore Port Inventory Continues to Accumulate, Spot Prices Under Pressure
Aug 7 News: At north China ports, manganese ore prices declined WoW across all grades: 46% Australian lumps (40-40.5 yuan/mtu), South African semi-carbonate (32.7-33.2 yuan/mtu), Gabonese ore (37.8-38.2 yuan/mtu), South African high-iron ore (28.5-29 yuan/mtu), and South African medium-iron ore (35-35.5 yuan/mtu). At south China ports, manganese ore prices were mixed WoW: 46% Australian lumps (42.9-43.4 yuan/mtu) remained flat, South African semi-carbonate (36.3-36.8 yuan/mtu) declined, Gabonese ore (40.6-41.1 yuan/mtu) declined, South African high-iron ore (31.2-31.7 yuan/mtu) declined, and South African medium-iron ore (38-38.5 yuan/mtu) remained flat. Manganese ore market prices are grinding lower, end-use demand is sluggish, and traders are commonly cutting prices to sell.
12 hours ago
[Hithium's World's First Integrated Long Duration Energy Storage (LDES) Industrial Park Starts Production]
13 hours ago
[Hithium's World's First Integrated Long Duration Energy Storage (LDES) Industrial Park Starts Production]
Read More
[Hithium's World's First Integrated Long Duration Energy Storage (LDES) Industrial Park Starts Production]
[Hithium's World's First Integrated Long Duration Energy Storage (LDES) Industrial Park Starts Production]
[Hithium's World's First Integrated Long Duration Energy Storage (LDES) Industrial Park Starts Production] Hithium's Shandong integrated long duration energy storage (LDES) industrial park started production in Heze Luxi New District. This industrial park is the world's first integrated industrial park focusing on long duration energy storage (LDES), with a total investment exceeding 13 billion yuan. After reaching full production, it will have an annual capacity of 30 GWh of 1175Ah long duration energy storage battery cells and 20 GWh of 6.25MWh systems. Hithium stated that, leveraging its large-scale capacity, the company will drive the global lithium battery long duration energy storage sector into an era of large-scale delivery.
13 hours ago
[SMM Cobalt-Lithium Morning Briefing] Lithium and Cobalt Prices Under Pressure and Diverging, Tug-of-War Between Sellers and Buyers Intensifies Material Market Consolidation
14 hours ago
[SMM Cobalt-Lithium Morning Briefing] Lithium and Cobalt Prices Under Pressure and Diverging, Tug-of-War Between Sellers and Buyers Intensifies Material Market Consolidation
Read More
[SMM Cobalt-Lithium Morning Briefing] Lithium and Cobalt Prices Under Pressure and Diverging, Tug-of-War Between Sellers and Buyers Intensifies Material Market Consolidation
[SMM Cobalt-Lithium Morning Briefing] Lithium and Cobalt Prices Under Pressure and Diverging, Tug-of-War Between Sellers and Buyers Intensifies Material Market Consolidation
This week, industry chain prices diverged. Lithium ore edged down alongside lithium carbonate, but mines continued to hold prices firm, making profit distribution across the industry chain a market focus. Supported by maintenance and tight spot order supply, lithium carbonate prices consolidated on a subdued note, while lithium hydroxide prices initially fell before rebounding. The cobalt industry chain remained generally under pressure—with weakening overseas quotations and sluggish off-season demand, refined cobalt, intermediate products, and cobalt salt prices continued to weaken, and the price spread between buyers and sellers widened. Nickel sulphate edged down, with the market still primarily focused on destocking; ternary cathode precursor prices declined due to weaker nickel and cobalt salt prices, while ternary cathode material prices remained basically stable. LFP prices proved resilient, supported by rising processing fees, with August production schedules continuing to grow and high-quality capacity remaining tight. Artificial graphite prices rose, the supply-demand balance for separators stayed in tight balance, and electrolyte prices were pushed up by raw material cost transmission. Supply of key materials for sodium-ion batteries remained tight, while recycling-side transactions were subdued. On the terminal side, EV and ESS demand maintained resilience, though the consumer market recovery remained limited. Looking ahead, the focus will be on peak season stockpiling and demand realization.
14 hours ago
Winshear Metals has reported the latest drill results from the Rodburn - Shanghai Metals Market (SMM)