Qixian Hongda Refractory Co., Ltd. Helps Create the 2027 SMM Global Copper Mines and Smelters Distribution Map

Published: Jul 23, 2026 11:27

From H2 2025 to early 2026, the copper industry underwent profound structural shifts. China's smelting capacity continued to be released, reliance on imported raw materials deepened, and the supply of copper concentrates remained persistently tight. Driven by monetary policy changes, geopolitical conflicts, production cuts at mines outside China, and accelerated industry consolidation, copper prices repeatedly hit new highs. The industry shifted from a tight balance to a structural deficit, further strengthening copper's role as a strategic resource.

Hereby, SMM joins hands with Qixian Hongda Refractory Co., Ltd. to cordially invite enterprises across copper mining, copper smelting, and related third-party equipment and consumables sectors to co-produce the . This initiative aims to gather high-quality industry resources and create an authoritative industry platform, helping enterprises enhance their industry influence and jointly promoting quality-driven industry development.

(Click this link to request a free copy of the map: )

Qixian Hongda Refractory Co., Ltd. was established in 2014 in Jialing Town, Qixian County, Shanxi Province. The company integrates R&D, production, sales, and construction. Its main products include furnace linings for ferrous/non-ferrous metal smelting, various castables, ramming materials (AH1 copper furnace dry ramming material, A18 copper alloy dry ramming material), and thermal insulation and anti-seepage refractories. It operates its own raw material production line and a professional construction team. Its products are supplied to the national metallurgical and foundry industry. Adhering to the Jin merchant tradition of integrity, the company develops proprietary processes adapted to high-temperature working conditions and maintains long-term collaborations with enterprises such as Ningbo Jintian Copper, Wuhan Heavy Industry, and North Copper.

Contact Information
Wen Guojie 152 3546 4459


SMM Co-production Contact

Ren Jie
186 5503 3505
renjie@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Bezant Resources Completes First Blast at Namibian Copper-Gold Project, Aiming for Concentrate Production
2 mins ago
Bezant Resources Completes First Blast at Namibian Copper-Gold Project, Aiming for Concentrate Production
Read More
Bezant Resources Completes First Blast at Namibian Copper-Gold Project, Aiming for Concentrate Production
Bezant Resources Completes First Blast at Namibian Copper-Gold Project, Aiming for Concentrate Production
Bezant Resources PLC has completed the first blast at the Hope open pit within its 90%-owned Hope & Gorob copper-gold project in Namibia, marking a further step toward mining and future concentrate production at the project. The initial blast involved approximately 20,000 tonnes of material and is expected to liberate around 2,000 tonnes of commercially viable mineralisation. Preliminary evaluation of the exposed mineralisation indicates that its location and grade are broadly consistent with the project's existing geological block model. Following the blast, grade-control work will compare assay results from blasthole samples with the exposed mineralisation to refine ore selection. Mining and transportation of run-of-mine (ROM) ore to the Tsaoxaub Metals flotation plant are expected to begin shortly, where material will be stockpiled ahead of future plant commissioning. Preparations for further mining are also progressing. Blastholes have already been drilled for a second blast, while the mining contractor has commenced ground clearance and separation of ore and waste for haulage. Recruitment of plant operators is ongoing following the appointment of the plant site manager, while the mine geology team is working with external consultants to validate the existing block model. The first blast represents an important operational milestone as Hope & Gorob moves closer to the processing stage. The next key developments will be the delivery of ROM ore to the plant, commissioning of the flotation facility and eventual production of saleable concentrate, providing clearer indications of the project's transition from development into copper-gold production.
2 mins ago
Antofagasta Cuts 2026 Copper Output Guidance Following Los Pelambres Shutdown
15 mins ago
Antofagasta Cuts 2026 Copper Output Guidance Following Los Pelambres Shutdown
Read More
Antofagasta Cuts 2026 Copper Output Guidance Following Los Pelambres Shutdown
Antofagasta Cuts 2026 Copper Output Guidance Following Los Pelambres Shutdown
According to foreign media reports, Chilean copper producer Antofagasta has lowered its 2026 copper production guidance following a weather-related shutdown at its Los Pelambres mine, reducing expected output at a time when global copper mine supply remains under pressure.​ Antofagasta now expects to produce 625,000–655,000 tonnes of copper in 2026, compared with its previous guidance of 650,000–700,000 tonnes. The revised range lowers the midpoint of the company's production outlook by 35,000 tonnes and reduces the upper end of its forecast by 45,000 tonnes.​ The downgrade follows the temporary shutdown of Los Pelambres in July after extreme rainfall affected Chile's Coquimbo Region. Although no significant damage was reported to major infrastructure, repairs are required to some pipeline platforms and water-management systems following the disruption.​ Despite lower production, stronger copper prices supported Antofagasta's financial performance during the first half of 2026. EBITDA increased 27% year on year to $2.84 billion, while operating cash flow rose 53% to $2.77 billion. First-half cash costs declined 8% year on year to $1.22/lb, although the company previously indicated that full-year costs are expected to increase amid persistently elevated fuel prices.​ From a copper-market perspective, the guidance reduction represents a further downward adjustment to expected mine supply from Chile, the world's largest copper-producing country. The disruption at Los Pelambres also highlights the continued vulnerability of near-term supply to operational and weather-related interruptions, with Antofagasta's reduced production outlook adding to existing constraints on global copper mine growth.
15 mins ago
US Retail Sales Drop in July, Raising Concerns Over Consumer Spending Resilience
3 hours ago
US Retail Sales Drop in July, Raising Concerns Over Consumer Spending Resilience
Read More
US Retail Sales Drop in July, Raising Concerns Over Consumer Spending Resilience
US Retail Sales Drop in July, Raising Concerns Over Consumer Spending Resilience
US consumer demand cooled notably in July, and retail sales data came in far below expectations, prompting more cautious market assessments of H2 consumer resilience.US Census Bureau data released Friday showed that July retail sales fell 0.6% MoM, the largest monthly decline since May 2025 and well below market expectations of a 0.1% increase. Lower auto purchases and a pullback in online retail were the main drags.
3 hours ago