[Solar: Chile revises remuneration mechanism for PMGD solar projects]

Published: Jun 19, 2026 14:24
Chile has introduced changes to the remuneration framework for solar projects under the PMGD scheme, which supports distributed generation projects of up to 9MW with access to stabilized tariffs. According to DNV, amendments to Supreme Decree 88 formally introduce the MEP Balance mechanism, meaning project revenues will no longer be based only on stabilized prices or marginal costs, but on a reference energy price adjusted by the MEP Balance. The mechanism incorporates storage charging and discharging, energy injections and withdrawals, marginal costs and later reimbursement obligations, creating new cash flow and operational risks for project owners.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Indonesia's First 30 GW Solar Tender Nears: Storage, Grid Integration and Local Content Become Critical [SMM Analysis]
Aug 21, 2026 16:16
Indonesia's First 30 GW Solar Tender Nears: Storage, Grid Integration and Local Content Become Critical [SMM Analysis]
Read More
Indonesia's First 30 GW Solar Tender Nears: Storage, Grid Integration and Local Content Become Critical [SMM Analysis]
Indonesia's First 30 GW Solar Tender Nears: Storage, Grid Integration and Local Content Become Critical [SMM Analysis]
The first-phase target has increased from 17 GW to 30 GW, but storage, grid readiness, financing and local-content rules will determine how quickly policy ambition becomes equipment demand.
Aug 21, 2026 16:16
[Guangdong Energy Group 2026 Second Batch Centralised Procurement Winning Bid Result Announcement for PV Modules]
Aug 21, 2026 13:54
[Guangdong Energy Group 2026 Second Batch Centralised Procurement Winning Bid Result Announcement for PV Modules]
Read More
[Guangdong Energy Group 2026 Second Batch Centralised Procurement Winning Bid Result Announcement for PV Modules]
[Guangdong Energy Group 2026 Second Batch Centralised Procurement Winning Bid Result Announcement for PV Modules]
On August 19, the winning bid result for Guangdong Energy Group’s 2026 second batch centralized tender procurement project for PV modules was announced. The winning enterprises were Hongyuan Green Energy Co., Ltd. and Hengdian Group DMEGC Magnetics Co., Ltd. The unit price range was 0.654 yuan/W–0.73 yuan/W. This tender project was Guangdong Energy Group’s 2026 second batch centralized tender procurement for PV modules, covering two PV projects invested in and constructed by Guangdong Energy Group’s subordinate units and their subsidiaries. This module tender was divided into two sections, of which: Section 1 was tentatively 139 MWp, and Section 2 was tentatively 31 MWp. The final procurement quantity was subject to the actual needs of the projects.
Aug 21, 2026 13:54
[Today, the market price of PV modules was basically stable]
Aug 21, 2026 13:52
[Today, the market price of PV modules was basically stable]
Read More
[Today, the market price of PV modules was basically stable]
[Today, the market price of PV modules was basically stable]
Today, module market prices were basically stable. At the end of the week, enterprise guidance prices saw few changes. Currently, upstream and downstream enterprises were still negotiating over module prices, and price game sentiment increased. However, the rise in module prices indeed led to an increase in inventory for module enterprises, and subsequent expectations for production cuts intensified.
Aug 21, 2026 13:52