KGHM and Freeport Launch Copper Mine Exploration in Chile; LME Copper and SHFE Copper Both Closed Lower Overnight [SMM Copper Morning Meeting Summary]

Published: May 8, 2026 09:25
SMM Morning Meeting Summary: Overnight, LME copper opened at $13,380.5/mt and then hovered at highs, touching a high of $13,449.5/mt before the center fluctuated downward. Near the end of the session, it tested a low of $13,283/mt and ultimately closed at $13,323.5/mt, down 0.51%, with trading volume at 17,000 lots and open interest at 272,000 lots, an increase of 4,370 lots from the previous trading day, indicating bears adding positions. Overnight, the most-traded SHFE copper 2606 contract opened at 103,300 yuan/mt, initially rising to 103,400 yuan/mt before the center fluctuated downward. Near the end of the session, it dipped to 102,580 yuan/mt and ultimately closed at 102,720 yuan/mt, down 0.27%, with trading volume at 37,700 lots and open interest at 197,000 lots, a decrease of 2,022 lots from the previous trading day, primarily indicating bulls reducing positions.

2026.5.8 Friday
Futures: LME copper opened at $13,380.5/mt overnight and hovered at highs, touching a high of $13,449.5/mt before the center fluctuated downward. It tested a low of $13,283/mt near the end of the session, ultimately closing at $13,323.5/mt, down 0.51%. Trading volume reached 17,000 lots, and open interest reached 272,000 lots, up 4,370 lots from the previous trading day, indicating bears adding positions. The most-traded SHFE copper 2606 contract opened at 103,300 yuan/mt overnight, initially rising to 103,400 yuan/mt before the center fluctuated downward. It dipped to 102,580 yuan/mt near the end of the session, ultimately closing at 102,720 yuan/mt, down 0.27%. Trading volume reached 37,700 lots, and open interest reached 197,000 lots, down 2,022 lots from the previous trading day, mainly reflecting bulls reducing positions.
[SMM Copper Morning Meeting Summary] News:
(1) On May 7 (Thursday), KGHM Chile, a subsidiary of KGHM Polska Miedz SA, signed an earn-in agreement with Minera Freeport-McMoRan South America Limitada, a subsidiary of Freeport-McMoRan Inc. (Freeport), initiating cooperation on a high-potential copper exploration opportunity in northern Chile. The agreement provides a structured framework for conducting early-stage exploration activities and evaluating the geological potential of the area. The area is located in one of Chile's most prospective copper mining regions, supported by favorable geological and geophysical indicators, with strong potential for early-stage assessment.
Spot:
(1) Shanghai: On May 7, the SHFE copper 2605 contract showed a pattern of declining, stabilizing, and rebounding during the morning session. It opened at 103,000 yuan/mt, edged down to 102,930 yuan/mt before rising to a high of 103,150 yuan/mt. Prices then declined, dipping to 102,630 yuan/mt, and consolidated between 102,630 yuan/mt and 102,730 yuan/mt before stabilizing and rising, with a closing price of 102,860 yuan/mt. The inter-month Contango price spread between futures contracts ranged from 90 yuan/mt to 20 yuan/mt. The import profit margin for SHFE copper against the 2605 front-month contract ranged from a loss of 180 yuan/mt to a loss of 70 yuan/mt. Looking ahead, premium quotes were high during the morning session, but market transactions failed to follow through. Suppliers proactively lowered their quotes during the second session, with the premium center shifting notably lower compared to the morning, reflecting limited downstream acceptance of high copper prices and spot premiums amid copper prices fluctuating at highs, with purchases driven mainly by rigid demand. Overall, amid the interplay between suppliers' increased willingness to sell and high prices suppressing demand, Shanghai spot copper prices against the 2605 contract are expected to maintain premiums today.
(2) Guangdong: On May 7, Guangdong #1 copper cathode spot prices against the front-month contract: high-quality copper was quoted at 270 yuan/mt, flat from the previous trading day; standard-quality copper was quoted at a premium of 190 yuan/mt, up 10 yuan/mt from the previous trading day; SX-EW copper was quoted at a premium of 120 yuan/mt, flat from the previous trading day. The average price of Guangdong #1 copper cathode was 103,025 yuan/mt, up 475 yuan/mt from the previous trading day; the average price of SX-EW copper was 102,915 yuan/mt, up 470 yuan/mt from the previous trading day. Overall, downstream consumption was tepid amid rising copper prices, and trading activity remained relatively quiet.
(3) Imported copper: On May 7, the average warrant price rose $5/mt from the previous trading day to $69/mt (price range: $62-76/mt); the average B/L price rose $5/mt from the previous trading day to $66/mt (price range: $61-73/mt); the average EQ copper (CIF B/L) price rose $5/mt from the previous trading day to $36/mt (price range: $30-42/mt), with quotes referencing cargoes arriving at ports in early to mid-May.
(4) Secondary copper: On May 7, the 11:30 futures closing price was 102,860 yuan/mt, up 180 yuan/mt from the previous trading day. The average spot premiums were 80 yuan/mt, down 20 yuan/mt from the previous trading day. On May 7, copper scrap prices rose 500 yuan/mt MoM. The copper scrap sales sentiment index rose to 2.52, and the purchase sentiment index rose to 2.19. The price difference between copper cathode and copper scrap was 1,376 yuan/mt, down 398 yuan/mt MoM. The price difference between copper cathode rod and secondary copper rod was 1,370 yuan/mt. According to an SMM survey, as copper price center shifted upward, many secondary copper rod enterprises still had no intention to restock raw materials. Meanwhile, copper scrap market prices were rather chaotic, with many traders reporting that the tax-inclusive bare bright copper deduction was in the range of 800-1,200 yuan/mt, and market transactions were very scarce.
Prices: Macro perspective, the US and Iran exchanged fire, but this did not break the existing ceasefire framework; additionally, Iran had not yet responded to the US proposal, and the market entered a wait-and-see mode, awaiting clearer signals from subsequent negotiations. Fundamentals side, supply side, domestic cargo arrivals decreased, and imported cargo arrivals at ports were delayed due to logistics disruptions, tightening spot supply in the market; demand side, copper prices fluctuating at highs suppressed downstream enterprises' purchase willingness, and the market was dominated by just-in-need restocking. Overall, copper prices were expected to show a narrow-range fluctuating trend in the doldrums today.
[The information provided is for reference only. This article does not constitute direct advice for investment research decisions. Clients should make prudent decisions and not use this as a substitute for independent judgment. Any decisions made by clients are not related to SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG Metals’ Gediktepe Sulphide Expansion Nears Completion; First Copper Concentrate Expected in August
19 mins ago
ACG Metals’ Gediktepe Sulphide Expansion Nears Completion; First Copper Concentrate Expected in August
Read More
ACG Metals’ Gediktepe Sulphide Expansion Nears Completion; First Copper Concentrate Expected in August
ACG Metals’ Gediktepe Sulphide Expansion Nears Completion; First Copper Concentrate Expected in August
ACG Metals said that, as of July 31, 2026, construction of the sulphide expansion project at its Gediktepe mine in Türkiye was substantially complete, with commissioning and punch-listing underway. First copper concentrate production is expected in August, marking the company’s transition into a copper producer. The primary conveyor network has been completed and is ready for commissioning, while filter presses have been installed and are entering final fitout. Process water ponds are being filled, the compressor room is substantially complete, and sulphide ore has already been loaded into the finger bins. Civil and structural work on the reagent storage facility is also well advanced.
19 mins ago
Lundin Mining Cuts 2026 Copper Production Guidance After Severe Storms in Chile
2 hours ago
Lundin Mining Cuts 2026 Copper Production Guidance After Severe Storms in Chile
Read More
Lundin Mining Cuts 2026 Copper Production Guidance After Severe Storms in Chile
Lundin Mining Cuts 2026 Copper Production Guidance After Severe Storms in Chile
Lundin Mining has lowered its 2026 copper production guidance after a second severe winter storm disrupted operations at its Caserones mine in Chile’s Atacama region, extending downtime and delaying the site’s recovery.​ The latest storm began on August 13 and brought heavy rainfall at lower elevations, together with unusually heavy snowfall and strong winds at higher altitudes. Caserones suffered a second power outage on August 14 after severe weather re-damaged a transmission tower that had already been affected by an earlier storm in July.​ The mine had previously experienced a power outage from July 18 to July 30. Lundin had initially expected the impact of the first disruption to be contained within the lower end of its original guidance range, but the second storm delayed the return to full operations and prompted a further revision to the company’s outlook.​ Caserones’ 2026 copper production guidance has been reduced to 120,000–130,000 tonnes, from 130,000–140,000 tonnes previously. Cash cost guidance has also been raised to $2.15–$2.35/lb, from $2.05–$2.25/lb.​ At the group level, Lundin Mining now expects consolidated 2026 copper production of 300,000–325,000 tonnes. Candelaria is still expected to meet its full-year production guidance, limiting the impact of the weather disruption largely to Caserones.​ Repair crews are working to restore the damaged transmission infrastructure, with full power expected by the end of the week before a gradual ramp-up of operations. Backup generators are continuing to support critical site infrastructure in the meantime.​ From a copper-market perspective, the guidance cut adds to a series of weather-related supply disruptions in Chile this year. The reduction at Caserones is relatively modest in global terms, but repeated operational setbacks across major Chilean mines continue to reinforce concerns around the reliability of near-term supply from the world’s largest copper-producing country.
2 hours ago
Korea Eximbank to Provide $1 Billion to Glencore to Secure Copper Supply
5 hours ago
Korea Eximbank to Provide $1 Billion to Glencore to Secure Copper Supply
Read More
Korea Eximbank to Provide $1 Billion to Glencore to Secure Copper Supply
Korea Eximbank to Provide $1 Billion to Glencore to Secure Copper Supply
The Export-Import Bank of Korea said on August 17 that it will provide $1 billion in financial support to Glencore, on the condition that the company supplies copper to Korean companies during the loan period. The funds will be used as Glencore’s general operating capital, while the financing structure is designed to help Korean companies secure key raw materials. Glencore operates mines, smelting assets and trading networks across multiple regions, including exposure to copper-producing countries such as Chile and Peru. Korea Eximbank said Glencore’s diversified asset and trading base could provide alternative procurement channels if supply disruptions occur in a specific country or mine. The arrangement does not add near-term copper production, but it strengthens copper procurement security for Korean companies.
5 hours ago