Copper Price Surge Fuels Wait-and-See Sentiment in Copper Scrap Market

Published: Apr 18, 2026 20:30 (GMT+8)
The copper scrap market this week operated under the impetus of a strong macro-driven rally in copper prices. Futures and spot prices rose in tandem, but the intensifying divergence in sentiment and behavior between upstream and downstream participants along the industry chain lent the market a complex character best described as "price-driven transactions amid an unchanged weak supply-demand landscape.

The copper scrap market this week operated under the impetus of a strong macro-driven rally in copper prices. Futures and spot prices rose in tandem, but the intensifying divergence in sentiment and behavior between upstream and downstream participants along the industry chain lent the market a complex character best described as "price-driven transactions amid an unchanged weak supply-demand landscape." On the supply side, structural contraction coexisted with wait-and-see sentiment. In the copper scrap segment, suppliers' willingness to sell warmed notably as copper prices climbed, with shipment activity picking up — particularly after copper prices breached the 100,000 yuan mark, prompting some suppliers to take profits at elevated levels. However, as prices pushed even higher, suppliers' bullish expectations for the market ahead rekindled a tendency to hold back from selling, with most opting to stockpile and wait for further price gains. As a result, actual circulating supply in the market did not increase meaningfully despite rising prices. Meanwhile, the secondary copper rod production side faced more direct supply shocks. According to an SMM survey, some enterprises in east China chose to halt production and adopt a wait-and-see stance due to renewed uncertainties in local policies, while enterprises in central and south-west China were forced to reduce operating days under tax compliance pressure. This directly led to a WoW decline in the secondary copper rod operating rate to 4.94%, with active supply-side contraction becoming a key factor constraining market liquidity.

On the demand side, a clear contradiction between "price sensitivity" and "insufficient momentum" was evident. Although the average price difference between copper cathode rod and secondary copper rod widened by 410 yuan/mt WoW to 1,600 yuan/mt, once again highlighting the theoretical cost advantage of secondary copper rod and stimulating downstream wire and cable enterprises' and traders' willingness to purchase and pick up goods, actual transaction volumes remained limited. This was primarily constrained by three pressures: First, elevated absolute copper prices severely suppressed end-use consumption sectors' actual purchasing capacity and willingness, with limited end-user orders restricting the sustainability of demand. Second, while traders showed some purchasing enthusiasm, they widely reported that secondary copper rod enterprises had restricted the orders they could accept due to difficulties in restocking raw materials, obstructing demand transmission. Third, downstream scrap utilization enterprises' purchasing sentiment underwent rapid shifts — from initial cautious observation, to a rush to buy amid continuous price rise to restock after prices breached key levels, and then to a "fear of heights" halt in purchasing as prices continued to surge. Such sentiment fluctuations caused demand release to exhibit a pulsed pattern, making it difficult to form stable support. Industry profitability remained dire. SMM model calculations showed that the average gross profit margin on secondary copper rod sales during the week remained deep in loss territory at -698 yuan/mt, while the recovery in the price difference between primary metal and scrap (the price spread between copper cathode and copper scrap) lagged relatively behind. This reflected the slow adjustment of tax-inclusive copper scrap prices, underpinned by invoice tax rate costs under the "reverse invoicing" policy, which continued to squeeze downstream processing margins. Overall, the copper scrap market is currently operating amid an intense tug-of-war between "high-price stimulus" and "weak fundamental constraints." Although rising copper prices briefly activated market trading sentiment, the high price levels themselves suppressed the intensity and sustainability of demand, while supply contraction and cost rigidity driven by policy factors constituted longer-term headwinds. It is expected that in the near term, capacity in policy-affected regions will be difficult to restore quickly. If supply continues to shrink, it may push secondary copper rod prices relatively stronger, thereby causing the currently widened price difference between copper cathode rod and secondary copper rod to face narrowing pressure once again. Breaking out of the current wait-and-see deadlock will depend on the stabilization of macro sentiment, a substantive recovery in end-user orders, and further clarification of detailed industrial policy measures. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
BIR Urges Urgent Industry Response as EU Waste Shipment Consultation Closes on October 16 中文快讯
55 mins ago
BIR Urges Urgent Industry Response as EU Waste Shipment Consultation Closes on October 16 中文快讯
Read More
BIR Urges Urgent Industry Response as EU Waste Shipment Consultation Closes on October 16 中文快讯
BIR Urges Urgent Industry Response as EU Waste Shipment Consultation Closes on October 16 中文快讯
The Bureau of International Recycling (BIR) is urging recycling companies to submit feedback by October 16 on the European Commission's proposed list of non-OECD countries eligible to receive certain non-hazardous waste exports. BIR has coordinated outreach involving diplomatic representatives from 18 countries and territories, including Malaysia, Thailand, India, Indonesia, Vietnam and Singapore. The organisation warned that excluding major scrap-importing destinations could significantly disrupt established copper and other metal scrap trade flows when the revised EU Waste Shipment Regulation takes effect in May 2027. The proposed list remains under consultation and has not been finalised.
55 mins ago
Mercuria Secures US$250 Million Copper Supply Deal with Chinese Miner in DR Congo
1 hour ago
Mercuria Secures US$250 Million Copper Supply Deal with Chinese Miner in DR Congo
Read More
Mercuria Secures US$250 Million Copper Supply Deal with Chinese Miner in DR Congo
Mercuria Secures US$250 Million Copper Supply Deal with Chinese Miner in DR Congo
Mercuria has reportedly agreed to provide up to US$250 million in prepayments to subsidiaries of Shanghai Jayson New Energy Materials Group, securing three years of copper supply from operations in the Democratic Republic of Congo, including the newly commissioned Kinga Kila project. The three operations produced approximately 56,000 tonnes of copper in H1 2026. The agreement highlights growing competition among global trading houses to secure African copper supply through prepayment arrangements. The parties have not publicly confirmed the transaction terms.
1 hour ago
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
1 hour ago
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
Read More
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
Idaho Copper Corporation’s updated preliminary economic assessment for its wholly owned CuMo copper-molybdenum-silver project estimates average annual contained-molybdenum production of 30.5 million pounds (about 13,835 metric tonnes) during the first 21 years of a 46-year mine life. Life-of-mine payable molybdenum is estimated at 906 million pounds (about 410,955 metric tonnes). Initial capital is US$1.169 billion, followed by US$658 million of expansion capital in year five. The company targets completion of a pre-feasibility study in 2028 and has not made a construction decision; the project is not current or near-term supply.
1 hour ago