[SMM PV News] Australia’s Largest Off-Grid Renewable Hybrid Plant to Power Eva Copper Project

Published: Apr 10, 2026 09:21
Scotland-headquartered Aggreko has finalized a landmark 15-year PPA with Harmony Gold to develop Australia’s largest off-grid renewable hybrid power facility for the Eva copper project in Queensland. The facility will combine a 118 MWp solar farm, a 250 MWh battery energy storage system, and 104 MVA of thermal backup to support the AUD 2.4 billion open-pit mine. This project underscores a significant shift in the Australian resources sector toward low-emission energy, setting a new benchmark for off-grid power by optimizing renewable integration to reduce fuel consumption and improve emissions performance across the mine’s lifecycle.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Photovoltaic] India's Uttar Pradesh YEIDA Zone Adding Combined 7GW of Solar Manufacturing Capacity
39 mins ago
[SMM Photovoltaic] India's Uttar Pradesh YEIDA Zone Adding Combined 7GW of Solar Manufacturing Capacity
Read More
[SMM Photovoltaic] India's Uttar Pradesh YEIDA Zone Adding Combined 7GW of Solar Manufacturing Capacity
[SMM Photovoltaic] India's Uttar Pradesh YEIDA Zone Adding Combined 7GW of Solar Manufacturing Capacity
39 mins ago
[Solar: Colombia awards 1.55GW of solar capacity in OEF auction]
48 mins ago
[Solar: Colombia awards 1.55GW of solar capacity in OEF auction]
Read More
[Solar: Colombia awards 1.55GW of solar capacity in OEF auction]
[Solar: Colombia awards 1.55GW of solar capacity in OEF auction]
Colombia’s system operator XM has completed its latest Firm Energy Obligations auction, awarding 4.07GW of new net effective capacity for the period from Dec. 1, 2029 to Nov. 30, 2030. Solar accounted for 1.55GW, alongside 246MW of wind and 2.28GW of thermal capacity. A total of 77 out of 85 participating plants secured allocations, including 29 solar projects. Although solar represented nearly 38% of newly awarded capacity, it accounted for only 7.7% of total firm energy allocated, reflecting Colombia’s reliability charge mechanism, which favors technologies with higher dispatch firmness. SMM believes solar is gaining a stronger role in Colombia’s capacity market, but storage, hybridization and improved dispatchability will be key to strengthening project revenue stability.
48 mins ago
[Solar: Paraguay launches tender for 140MW Loma Plata PV project]
1 hour ago
[Solar: Paraguay launches tender for 140MW Loma Plata PV project]
Read More
[Solar: Paraguay launches tender for 140MW Loma Plata PV project]
[Solar: Paraguay launches tender for 140MW Loma Plata PV project]
Paraguay’s National Electricity Administration has launched a tender for the 140MW Loma Plata solar project in the Boquerón department. The plant will connect to the national grid through the 220kV Loma Plata substation, with the scope covering engineering, construction, operation and maintenance of both the solar plant and related transmission infrastructure. The project, supported by the World Bank, is the first concrete step under Paraguay’s new renewable energy framework, Law No. 7599/2025. SMM believes the law’s provisions for up to 30-year renewable PPAs and storage-related mechanisms could help unlock future solar and solar-plus-storage development in Paraguay.
1 hour ago
Scotland-headquartered Aggreko has finalized a landmark 15-year PPA wi - Shanghai Metals Market (SMM)