【SMM Flash News】Pertamina’s Manpatu Project Achieves Jacket Load-Out; Set for Installation in Mahakam Waters

Published: Mar 30, 2026 00:26
PT Pertamina Hulu Mahakam (PHM) marked a major milestone on March 26, 2026, with the successful load-out of the Manpatu project jacket at Tanjung Pinang, Riau Islands. Located 35 km off Balikpapan, the gas and condensate field is designed for a capacity of 80 MMSCFD. The project involves a 1,380-tonne jacket, a 1,100-tonne topside, 2.5 km of subsea pipelines, and the drilling of 11 new wells. Notably, PHM is pioneering the total use of local Electric Resistance Welding (ERW) pipes for the subsea system, while maintaining a safety record of over 2 million man-hours without LTI.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
PT Pertamina Hulu Mahakam (PHM) marked a major milestone on March 26, - Shanghai Metals Market (SMM)