CSIC 712's Hydrogen Peak No. 1 Hexacopter UAV Completes Maiden Flight

Published: Mar 24, 2026 14:36
[SMM Hydrogen Energy Bulletin] Recently, the 100-kg-class hydrogen-powered hexacopter UAV "Hydrogen Peak No. 1," developed under the leadership of CSIC 712 Research Institute, successfully completed its maiden flight. It is understood that Hanqing Power, as the primary supplier of the hydrogen supply system for hydrogen fuel cell UAVs, participated in the formulation of T/CEEIA265-2017, Technical Specifications for Fuel Cell Fuel Systems for Unmanned Aerial Vehicles, by the China Electrotechnical Society.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Xinjiang's Bole City Launches 200MW/800MWh Energy Storage Project
15 hours ago
Xinjiang's Bole City Launches 200MW/800MWh Energy Storage Project
Read More
Xinjiang's Bole City Launches 200MW/800MWh Energy Storage Project
Xinjiang's Bole City Launches 200MW/800MWh Energy Storage Project
On April 11, the 200MW/800MWh energy storage project in Bole City, Bortala Mongol Autonomous Prefecture, Xinjiang Uygur Autonomous Region officially commenced construction. As the first energy storage project to formally break ground in the area, the project involves a total investment of 856 million yuan, covers approximately 80 mu of land, and has a construction period of 180 days. The main construction scope includes a new 110kV step-up substation, with electricity being stepped up and fed into the Zaojiaoshu 220kV step-up collection station for grid connection. With a construction capacity of 200MW/800MWh, the project adopts a combined grid-forming and grid-following technical scheme, and employs advanced technologies such as SST direct-connected technology, offering advantages including reliable design, rapid response, and strong regulation capability.
15 hours ago
Shenneng Beikong Hosts Symposium & Signing for China's Largest-Scale Compressed Air ESS Project
15 hours ago
Shenneng Beikong Hosts Symposium & Signing for China's Largest-Scale Compressed Air ESS Project
Read More
Shenneng Beikong Hosts Symposium & Signing for China's Largest-Scale Compressed Air ESS Project
Shenneng Beikong Hosts Symposium & Signing for China's Largest-Scale Compressed Air ESS Project
On April 10, Shenneng Beikong Company held a symposium and signing ceremony in Beijing for the winning bidders of the underground gas storage facility project for the Xi Ujimqin Banner grid-side compressed air energy storage project. The project is planned to have a construction scale of 3×350 MW/4,200 MWh, making it currently the leading single-unit compressed air ESS power station in China in terms of scale. The underground gas storage facility undertakes the core functions of high-pressure, large-capacity, and long-cycle safe operation, and is a key project that determines technical feasibility and economic viability.
15 hours ago
Sichuan's First Integrated Storage-Computing ESS Power Station Kicks Off Construction
15 hours ago
Sichuan's First Integrated Storage-Computing ESS Power Station Kicks Off Construction
Read More
Sichuan's First Integrated Storage-Computing ESS Power Station Kicks Off Construction
Sichuan's First Integrated Storage-Computing ESS Power Station Kicks Off Construction
Recently, Sichuan Province's first integrated storage-computing composite ESS power station — Pengzhou Tuogang ESS Power Station — officially broke ground. The project adopts a hybrid technology route of "LFP electrochemical energy storage + 2.5 MW supercapacitor," with a total capacity of 100 MW/200 MWh. As a key demonstration project for grid-side new-type energy storage in Sichuan Province in 2025, it plans to achieve full-capacity grid connection and commissioning before the "peak summer" period in August this year.
15 hours ago
[SMM Hydrogen Energy Bulletin] Recently, the 100-kg-class hydrogen-pow - Shanghai Metals Market (SMM)