Divergent Trends in Asian Scrap Copper Markets: China and Japan Discount Rate Rise While South Korea Holds Steady

Published: Mar 16, 2026 11:06
Recent trends in Asian scrap copper markets are diverging: China’s Bare Bright copper import discount rate have climbed to 98%-98.5% due to tight tax-inclusive copper scrap supply, pushing Japanese quotes up by 1 percentage point to similar levels via strong market linkage. Conversely, South Korea remains stable at 97.5%-98% due to high domestic inventories level. According to feedback from local downstream enterprises, high domestic inventory levels mean current procurement discount rate are expected to remain unchanged through the second quarter,

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
5 hours ago
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
Read More
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
Shaanxi-Henan UHV DC Project, Final in "Three Exchanges Nine Direct," to Be Completed by 2028
On March 31, the National Grid announced that the Shaanxi-Henan ± 800 kV UHV DC project, the final project of the "three exchanges and nine direct" projects in the National "14th Five-Year" plan, with a total investment of 19 billion yuan.It starts in Yulin, Shaanxi, and ends in Kaifeng, Henan, passing through Shaanxi, Shanxi, and Henan provinces. The total length of the line is 728 kilometers, the transmission capacity is 8 million kilowatts, and it is planned to be completed and put into operation in 2028.
5 hours ago
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
5 hours ago
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
Read More
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
National Grid's Panxi UHV AC Project, a $23.2B Investment, to Span 994km and Complete by 2028
On March 31, the National Grid announced that the Panxi UHV AC project, the first UHV AC project to start construction during the "14th Five-Year Plan" of the National Grid, has a total investment of about 23.2 billion yuan. The project will pass through 12 counties (districts) in Liangshan, Yibin, and Leshan, build two 1000 kV substations in Panxi and Chuannan, and expand Tianfu South Station. The total length of the line is 994 kilometers, and it is expected to be completed and put into operation in 2028.
5 hours ago
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
Apr 5, 2026 02:04
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
Read More
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
"Fluctuating Copper Prices and Tight Supply Squeeze Secondary Copper Industry, Pressuring Upstream and Downstream"
This week, against the backdrop of fluctuating upward copper prices, the secondary copper industry chain showed a complex situation in which extremely tight upstream raw material supply coexisted with persistent negative margins for downstream finished products. In the secondary copper rod market, SMM data showed that the operating rate fell further to 5.45% this week, down 0.38 percentage points MoM and 25.43 percentage points YoY
Apr 5, 2026 02:04
Recent trends in Asian scrap copper markets are diverging: China’s Bar - Shanghai Metals Market (SMM)