Jiangsu Approves New 1 Gwh Annual Battery Pack Project by Yancheng Baigu Energy Technology

Published: Mar 10, 2026 14:06
New 1 Gwh Annual Battery Pack Project Added in Jiangsu
The Yandu Ecological Environment Bureau of Yancheng City issued a public notice stating that the environmental impact assessment documents for the industrialisation project of a new energy battery system (with annual output of 1 Gwh of battery packs) had been approved. The project is located at No. 12, Group 3, Yuema Residents’ Committee, Yanlong Subdistrict, Yandu District, Yancheng, Jiangsu Province. The developer, Yancheng Baigu Energy Technology Co., Ltd., is expected to invest 30 million yuan to build the new energy battery system industrialisation project using existing premises. Upon completion, the project will have annual battery pack capacity of 1 Gwh.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
15 hours ago
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
Read More
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
15 hours ago
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
Mar 27, 2026 18:05
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
Read More
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
March 27 News: Northern ports: South African high-grade ore was 36-37.9 yuan/mtu, up WoW from last Friday; South African semi-carbonate was 43.5-44 yuan/mtu, up WoW from last Friday; Gabon ore was 47.3-47.9 yuan/mtu, up WoW from last Friday; 46% Australian lumps were 48-48.5 yuan/mtu, up WoW from last Friday. South China ports: South African high-grade ore was 34.5-35 yuan/mtu, flat WoW from last Friday; South African semi-carbonate was 38.8-39.5 yuan/mtu, up WoW from last Friday; Gabon ore was 44-44.5 yuan/mtu, up WoW from last Friday; 46% Australian lumps were 45.2-45.7 yuan/mtu, up WoW from last Friday.
Mar 27, 2026 18:05
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Mar 27, 2026 17:42
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Read More
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Starting in 2027, L&F will supply LFP battery cathode materials to Samsung SDI for three consecutive years.
Mar 27, 2026 17:42