Tender for the Procurement of Steel Strip for Welding Wire in March 2026 for Metallurgical Machinery

Published: Mar 11, 2026 14:00

1. Procurement Conditions

The procurement entity for this procurement project, Metallurgical Machinery March 2026 Steel Strip for Welding Wire Procurement (AGZYFZHGXHD260309272380), is Angang Group Zhongyuan Industrial Development Co., Ltd. The procurement project was funded by self-raised funds. The project had met the procurement conditions, and an open comparative inquiry was now conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: Metallurgical Machinery March 2026 Steel Strip for Welding Wire Procurement

2.2 Alternative Procurement Method in Case of Procurement Failure: Negotiation procurement

2.3 For the contents, scope, and scale of this project procurement, please refer to the attachment "Material List Attachment.pdf" for details.

3. Bidder Qualification Requirements

3.1 Joint bids were not permitted for this procurement.

3.2 This procurement required bidders to have the following qualification requirements:

(1) Manufacturing business license

(2) Distribution business license

3.3 This procurement required bidders to meet the following registered capital requirements:

Registered capital for manufacturers: 600,000 yuan and above

Registered capital for distributors: 600,000 yuan and above

3.4 This procurement required bidders to meet the following performance requirements:

See the attachment for details (if required)

3.5 This procurement required bidders to have the following capability requirements, financial requirements, and other requirements:

Financial requirements: See the attachment for details (if required)

Capability requirements: See the attachment for details (if required)

Other requirements: See the attachment for details (if required)

3.6 For projects that were legally required to undergo tender, bids submitted by dishonest persons subject to enforcement were invalid.

4. Acquisition of Procurement Documents

4.1 Any interested bidder shall, from 17:00 on March 09, 2026 to 08:00 on March 18, 2026 (Beijing time, the same hereinafter), log in to the Ansteel Smart Tender and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents.

Click to View Tender Details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Apr 8, 2026 11:12
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Read More
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
According to an announcement by NFC, on April 2, 2026, Zhongse Indonesia Dari Mining Co., Ltd., a holding subsidiary of China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd., obtained the "Environmental Feasibility Decision (SKKL) on Mining Activities of Lead-Zinc Ore by Dari Mining in SilimaPungga-Pungga Township, Dari County, North Sumatra Province" issued by the Ministry of Environment of the Republic of Indonesia. According to NFC's disclosure, the mine is an underground mine with a designed capacity of 1 million mt/year. As of 2024, the total resources/reserves of the Dari lead-zinc mine were: ore volume of 20.7009 million mt, zinc metal content of 2.2562 million mt, lead metal content of 1.3203 million mt, with an average zinc grade of 10.90% and an average
Apr 8, 2026 11:12
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Apr 7, 2026 14:07
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Read More
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Recently, Inner Mongolia Shuangli Mining Co., Ltd. (hereinafter referred to as "Shuangli Mining") held the completion and trial production ceremony for the upgrading and capacity expansion project of the mining and beneficiation system at the No. 2 Iron Mine in the Geqi mining area.Once the project reaches full production, it will produce 870,000 mt of iron ore concentrates, 9,580 mt of copper concentrates, 5,432 mt of lead concentrates, and 2,052 mt of zinc concentrates annually, injecting new momentum into Shuangli Mining's green and high-quality development.
Apr 7, 2026 14:07
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Mar 24, 2026 17:21
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Read More
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
[Molybdenum-Iron Tender Information] SMM, March 24: It is reported that on March 23, a special steel group in east China announced the tender price for a new round of ferromolybdenum procurement, with the tax-inclusive plant-delivered acceptance-settled price at 277,500 yuan/mt, down 2,000 yuan/mt from the tender price on March 18. The public tender purchase volume was 120 mt (bid volume), while the actual total purchase volume remained to be determined.
Mar 24, 2026 17:21
Tender for the Procurement of Steel Strip for Welding Wire in March 2026 for Metallurgical Machinery - Shanghai Metals Market (SMM)