[SMM PV News] Trial Operations Begin at Iraq's 1 GW Basra Solar Plant

Published: Mar 5, 2026 17:36
Trial operations have commenced at the 1 GW Basra solar power plant, Iraq's first gigawatt-scale PV project. Currently, 61 MW of the first 250 MW unit is active, with full grid connection planned once the unit reaches its peak capacity. Developed by a consortium of TotalEnergies (45%), Basrah Oil Co. (30%), and QatarEnergy (25%), the 900-hectare facility aims for full commissioning by 2028 to power 350,000 homes. This marks a massive leap for Iraq, which had only 42 MW of solar in 2024, as it targets 12 GW of solar capacity by the end of the decade.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Suniva to Invest $350M in New 4.5 GW Cell Factory
4 hours ago
[SMM PV News] Suniva to Invest $350M in New 4.5 GW Cell Factory
Read More
[SMM PV News] Suniva to Invest $350M in New 4.5 GW Cell Factory
[SMM PV News] Suniva to Invest $350M in New 4.5 GW Cell Factory
Suniva is investing $350M in a new 4.5 GW solar cell plant in South Carolina, set to open in Q2 2027. This brings its total capacity to 5.5 GW+. As a merchant supplier, Suniva aims to bridge the U.S. cell production gap, helping domestic module makers meet IRA "Domestic Content" rules to qualify for the 10% bonus tax credit.
4 hours ago
[SMM PV News] Beijing Targets 2 GW New Renewable Capacity by 2030
6 hours ago
[SMM PV News] Beijing Targets 2 GW New Renewable Capacity by 2030
Read More
[SMM PV News] Beijing Targets 2 GW New Renewable Capacity by 2030
[SMM PV News] Beijing Targets 2 GW New Renewable Capacity by 2030
Beijing has issued its 15th Five-Year Plan (2026-2030), targeting an additional 2 GW of solar and wind capacity during the period and aiming to meet all new electricity demand with clean energy generation. The plan also targets 65 billion kWh of imported clean electricity, supports the deployment of energy storage, including compressed air systems, and promotes integrated solar-storage-charging solutions. It emphasizes the development of perovskite PV and solid-state batteries, and aims to have renewable energy account for 15% of the city's heating area by 2030.
6 hours ago
[SMM PV News] GEPIC Plans 1 GW Wind-Solar Hybrid Project in Gansu
6 hours ago
[SMM PV News] GEPIC Plans 1 GW Wind-Solar Hybrid Project in Gansu
Read More
[SMM PV News] GEPIC Plans 1 GW Wind-Solar Hybrid Project in Gansu
[SMM PV News] GEPIC Plans 1 GW Wind-Solar Hybrid Project in Gansu
Provincial energy developer Gansu Electric Power Investment Group (GEPIC) plans to build a 1 GW wind-solar hybrid project in Qingyang, Gansu Province, comprising 750 MW of wind and 250 MW of PV capacity. The project carries a total investment of about RMB 4.377 billion, with a projected post-tax payback period of 16.34 years and an equity internal rate of return (IRR) of 2.17%.
6 hours ago
Trial operations have commenced at the 1 GW Basra solar power plant, I - Shanghai Metals Market (SMM)