Outstanding Settlement Data for Hunan's Independent New-Type Energy Storage in 2025

Published: Feb 25, 2026 08:50
On February 10, the Hunan Electricity Trading Center released the settlement overview of the Hunan electricity market for 2025. Data showed that the Hunan electricity market operated steadily, with the profitability of independent new-type energy storage being the biggest highlight. Independent new-type energy storage recorded a grid-side settlement electricity volume of 456 million kWh and grid-side settlement electricity revenue of 208 million yuan, with a grid-side average settlement price of 455.268 yuan per megawatt hour. The load-side settlement electricity volume was 540 million kWh and the load-side settlement electricity revenue was 120 million yuan, with a load-side average settlement price of 222.22 yuan per megawatt hour. The average settlement price spread between grid-side and load-side for independent new-type energy storage was 0.233048 yuan/kWh.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM New Energy] Zijin Mining's Three-Year Plan: Lithium Carbonate Production to Increase from 25,000 mt to 320,000 mt
4 mins ago
[SMM New Energy] Zijin Mining's Three-Year Plan: Lithium Carbonate Production to Increase from 25,000 mt to 320,000 mt
Read More
[SMM New Energy] Zijin Mining's Three-Year Plan: Lithium Carbonate Production to Increase from 25,000 mt to 320,000 mt
[SMM New Energy] Zijin Mining's Three-Year Plan: Lithium Carbonate Production to Increase from 25,000 mt to 320,000 mt
Zijin Mining released an announcement regarding its three-year (2026-2028) production plan for major mineral products and its long-term vision for 2035. The lithium carbonate equivalent production targets for 2026 and 2028 are set at 120,000 mt and 270,000-320,000 mt, respectively, representing increases of 380% and 980%-1180% compared to the 2025 production of 25,000 mt.
4 mins ago
[SMM New Energy] Mercedes recalls 19,000 China-made EVs starting June 2026 due to BMS issues and battery fire risks.
11 mins ago
[SMM New Energy] Mercedes recalls 19,000 China-made EVs starting June 2026 due to BMS issues and battery fire risks.
Read More
[SMM New Energy] Mercedes recalls 19,000 China-made EVs starting June 2026 due to BMS issues and battery fire risks.
[SMM New Energy] Mercedes recalls 19,000 China-made EVs starting June 2026 due to BMS issues and battery fire risks.
Beijing Benz Automotive Co., Ltd. is recalling 19,481 domestically produced EQA and EQB electric vehicles manufactured between April 2021 and March 2024. Starting June 25, 2026, the recall addresses potential internal short circuits caused by production fluctuations in high-voltage batteries and software-related overloads. These defects in the Battery Management System (BMS) increase the risk of vehicle fires, posing significant safety hazards. The move aligns with China's defective product regulations to ensure battery reliability and passenger safety.
11 mins ago
[SMM New Energy] Total investment exceed 3.1B yuan, Toyota plans to build a 2GWh ESS battery manufacturing plant.
21 mins ago
[SMM New Energy] Total investment exceed 3.1B yuan, Toyota plans to build a 2GWh ESS battery manufacturing plant.
Read More
[SMM New Energy] Total investment exceed 3.1B yuan, Toyota plans to build a 2GWh ESS battery manufacturing plant.
[SMM New Energy] Total investment exceed 3.1B yuan, Toyota plans to build a 2GWh ESS battery manufacturing plant.
Japan's major battery company, GS Yuasa International Ltd., announced the launch of its "Battery Stable Power Supply Assurance Plan." It intends to construct an ESS battery manufacturing plant with an annual capacity of 2 GWh in northern Tokyo. The total project investment amounts to 70.3 billion yen (approximately 3.13 billion yuan). The plant is expected to commence operations in October 2028 and will become one of Japan's largest battery factories upon completion.
21 mins ago