[SMM PV News] CCECC to Build Nigeria’s First 7 MW Floating Solar Project for University of Lagos

Published: Jan 28, 2026 09:11
The Rural Electrification Agency of Nigeria has awarded the contract for the country's first floating solar array to the Nigerian arm of China Civil Engineering Construction Corporation (CCECC). This 7 MW project will be constructed on the lagoon waters surrounding the University of Lagos and is designed to supply electricity directly to the institution. Although specific costs and timelines remain undisclosed, the initiative highlights Nigeria's significant potential in this sector, which ranks second in Africa with a theoretical annual generation capacity of 93 TWh. While floating solar remains rare across the continent, development is accelerating with major projects like the 600 MW installation on Lake Kariba, and Nigeria itself has seen strong general solar growth with 1.4 GW added in 2025 to reach over 4.8 GW of cumulative capacity.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Safetian's Holding Co Anhui Meidalun to Temporarily Halt Some Production Lines for Up to 60 Days
23 hours ago
Safetian's Holding Co Anhui Meidalun to Temporarily Halt Some Production Lines for Up to 60 Days
Read More
Safetian's Holding Co Anhui Meidalun to Temporarily Halt Some Production Lines for Up to 60 Days
Safetian's Holding Co Anhui Meidalun to Temporarily Halt Some Production Lines for Up to 60 Days
On 29 January, Safetian (SH:603028) announced that its holding company, Anhui Meidalun, will temporarily suspend production on certain production lines for maintenance and equipment upgrades in accordance with its annual production and operational plan. The temporary suspension is scheduled to commence shortly and is expected to last no longer than 60 days.
23 hours ago
[SMM Analysis] India PV Market Observation: DCR Module Premium Pulls Back, Price Trend Returns to Cost Logic
23 hours ago
[SMM Analysis] India PV Market Observation: DCR Module Premium Pulls Back, Price Trend Returns to Cost Logic
Read More
[SMM Analysis] India PV Market Observation: DCR Module Premium Pulls Back, Price Trend Returns to Cost Logic
[SMM Analysis] India PV Market Observation: DCR Module Premium Pulls Back, Price Trend Returns to Cost Logic
In early 2026, India's PV market exhibited a unique "dual-track" pricing characteristic for modules, driven by policy barriers and local capacity ramp-up.
23 hours ago
National Energy Administration: Deepening Comprehensive Rectification of Involution-Style Competition in the PV Industry
Jan 30, 2026 13:28
National Energy Administration: Deepening Comprehensive Rectification of Involution-Style Competition in the PV Industry
Read More
National Energy Administration: Deepening Comprehensive Rectification of Involution-Style Competition in the PV Industry
National Energy Administration: Deepening Comprehensive Rectification of Involution-Style Competition in the PV Industry
[SMM Flash] On January 30, Xing Yiteng, Deputy Director of the Development Planning Department of the National Energy Administration, stated at a regular press conference that in 2025, the energy sector achieved remarkable results in orderly development. In 2025, the National Energy Administration further advanced the comprehensive management of involution-style competition in the PV industry. By the end of 2025, polysilicon and wafer prices reached 53.86 yuan/kg and 1.329 yuan/piece, respectively, up 52% and 35.6% from their annual lows.
Jan 30, 2026 13:28