[SMM Analysis] Weak Demand Leads to Decline in Manganese Dioxide Production in November

Published: Nov 30, 2025 00:11
In November 2025, the EMD market officially entered the traditional off-season, with production showing a slight decline MoM. Affected by shrinking downstream demand and narrowing order volumes, the industry's operating rate also decreased, presenting overall market characteristics of "weak demand, lower operating rates, and reduced production.

In November 2025, the EMD market officially entered the traditional off-season, with production showing a slight decline MoM. Affected by shrinking downstream demand and narrowing order volumes, the industry's operating rate also decreased. The overall market exhibited the operational characteristics of "weak demand, declining operating rates, and reduced production."

By product category, the production of carbon-zinc and alkaline manganese EMD saw a more noticeable decline. After the end of the September-October peak season in October, procurement by downstream battery enterprises returned to just essential needs, and their willingness to actively stockpile decreased, leading to adjustments in the corresponding EMD production schedules. The production of MnO2 used for LMO batteries remained stable at low levels, as the demand side lacked incremental support, making it difficult for production to rebound. On the other hand, raw material prices continued to fluctuate at highs. To control costs and avoid inventory buildup, production plans were further tightened.

Looking ahead to December 2025, the EMD market is expected to remain in the traditional off-season. There are no significant positive stimuli in the end-use consumer market, and procurement demand from primary battery enterprises is likely to stay at essential levels, with order volumes unlikely to rebound significantly. The substitution pressure on MnO2 used for LMO batteries is expected to persist, and there are no expectations for improvement on the demand side. As year-end approaches, enterprises will focus on controlling inventory and ensuring cash flow, adopting a more cautious approach to production arrangements. Overall, EMD production in December is expected to continue its downward trend, with the market maintaining a weak balance.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Kazakhstan Builds 4.1 Mt of Coal Stocks at Thermal Power Plants Ahead of Heating Season】
11 mins ago
【Kazakhstan Builds 4.1 Mt of Coal Stocks at Thermal Power Plants Ahead of Heating Season】
Read More
【Kazakhstan Builds 4.1 Mt of Coal Stocks at Thermal Power Plants Ahead of Heating Season】
【Kazakhstan Builds 4.1 Mt of Coal Stocks at Thermal Power Plants Ahead of Heating Season】
Kazakhstan’s Transport Ministry said thermal power plants had received 17.8 Mt of coal since 1 May 2026, while 1.2 Mt had been supplied to the communal sector. Current stocks stand at 4.1 Mt at thermal power plants and 0.3 Mt in the communal sector. Kazakhstan is preparing a comprehensive action plan to ensure stable coal deliveries during the heating season, with a focus on uninterrupted supply to energy and communal facilities and efficient railway use during peak demand. Kaztemirtrans operates 29,000 open wagons, which the Ministry considers sufficient for coal deliveries to power plants, households and industry. The Energy Ministry has also launched a unified digital system to track coal from extraction through transportation, delivery and sale.
11 mins ago
【Australia’s Isaac Downs Extension EIS Enters Public Consultation, With Proposed ROM Output of 2–4.5 Mtpa】
11 mins ago
【Australia’s Isaac Downs Extension EIS Enters Public Consultation, With Proposed ROM Output of 2–4.5 Mtpa】
Read More
【Australia’s Isaac Downs Extension EIS Enters Public Consultation, With Proposed ROM Output of 2–4.5 Mtpa】
【Australia’s Isaac Downs Extension EIS Enters Public Consultation, With Proposed ROM Output of 2–4.5 Mtpa】
The Queensland Government has allowed the Environmental Impact Statement for the Isaac Downs Extension project to proceed to public consultation, with submissions open from 19 August to 29 September 2026. Proposed by Stanmore ID Extension Pty Ltd, the project involves the development of an open-cut coal mine southwest of the existing Isaac Downs Mine (IDM), with planned run-of-mine coal production of 2–4.5 Mtpa over a 15-year mine life. The project would be integrated into the Isaac Plains Complex (IPC) and use existing infrastructure, including the coal handling and preparation plant, train-loading facility, rail loop, internal haul roads and water and power connections. However, it remains in the environmental assessment stage. The proponent must respond to public submissions before an EIS assessment report is completed, while Commonwealth approval is also required.
11 mins ago
【Aurizon Secures Long-Term BMA Coal Haulage Contract With Annual Capacity of up to 37 Mt】
12 mins ago
【Aurizon Secures Long-Term BMA Coal Haulage Contract With Annual Capacity of up to 37 Mt】
Read More
【Aurizon Secures Long-Term BMA Coal Haulage Contract With Annual Capacity of up to 37 Mt】
【Aurizon Secures Long-Term BMA Coal Haulage Contract With Annual Capacity of up to 37 Mt】
Australian rail freight operator Aurizon has secured a long-term coal haulage contract for BHP Mitsubishi Alliance’s operations in Central Queensland. The contract will take effect in July 2028 and replace the existing agreement signed in 2015. It allows for annual haulage of up to 37 Mt and could run for as long as 12 years, subject to agreed performance and extension arrangements. The contract covers the Goonyella Riverside, Broadmeadow, Peak Downs, Saraji and Caval Ridge metallurgical coal mines. The 37 Mt figure represents the maximum rail haulage capacity under the contract, rather than mine production, incremental output or a guaranteed transport volume.
12 mins ago