Anglo American Group Expands Clavico Copper Mine Project

Published: Jun 9, 2025 13:49

According to a report on the BNAmericas website, Anglo American, a London-based company, is preparing to invest US$25.7 million to expand its Quellaveco copper mine in the Moquegua region of Peru.

The company has submitted its 13th technical report supporting this work to the environmental certification authority (Senace). It is expected that these modifications will have limited environmental and social impacts, and the assessment will take three to four months.

This report was prepared by the consulting firm Insideo.

The report indicates that Anglo American has proposed five modifications, with the work to be completed from 2025 to 2027:

1. Optimization of mine access: Engineering work near the waste dump (DME);

2. Construction of a water management system (drive lines, reservoirs, channels, and check dams);

3. Increasing ore handling capacity from 140 million mt/year to 150 million mt/year;

4. Drilling to confirm new reserves;

5. Adjustments to the environmental monitoring plan.

Among these, the exploration will take the longest time, while other work needs to be completed in the first half of 2026, the report said. This work will require 111 temporary workers.

In Q1, Quellaveco produced 79,900 mt of copper, compared to 72,000 mt in the same period last year. The production target for the full year of 2025 is 310,000-340,000 mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Copper Scrap Payability Coefficients Hold Exceptionally Firm as Supply-Demand Mismatch Defies Traditional Market Logic
8 hours ago
Copper Scrap Payability Coefficients Hold Exceptionally Firm as Supply-Demand Mismatch Defies Traditional Market Logic
Read More
Copper Scrap Payability Coefficients Hold Exceptionally Firm as Supply-Demand Mismatch Defies Traditional Market Logic
Copper Scrap Payability Coefficients Hold Exceptionally Firm as Supply-Demand Mismatch Defies Traditional Market Logic
In May, copper prices surged before retracing, yet copper scrap payability coefficients remained exceptionally firm. Transactions for Millberry stabilized at a high level of 98.5%, while No. 2 copper became the market highlight, with its coefficient climbing from around 95% to 96%–97% due to the premium upside of its gold and silver by-products. Driven by stricter domestic policies and tax compliance, China demand remained robust. Conversely, tight overseas scrap supply persisted, and this structural mismatch kept import payability coefficients elevated and sticky for the short term. Under the current landscape of tight global supply and resilient demand, the traditional market logic of "surging copper prices driving down payability coefficients" has effectively become obsolete.
8 hours ago
Copper Cathode Output Down 0.81% MoM in May, Up 2.73% YoY
9 hours ago
Copper Cathode Output Down 0.81% MoM in May, Up 2.73% YoY
Read More
Copper Cathode Output Down 0.81% MoM in May, Up 2.73% YoY
Copper Cathode Output Down 0.81% MoM in May, Up 2.73% YoY
[SMM Copper Cathode Production] Copper cathode production in May came in at 1.1694 million mt, down 0.81% MoM and up 2.73% YoY. Cumulative production from January to May was 5.8761 million mt, up 7.66% YoY cumulatively.
9 hours ago
Copper Cathode Output Dips in May, June Forecast Slightly Lower Amid Ongoing Smelter Maintenance
9 hours ago
Copper Cathode Output Dips in May, June Forecast Slightly Lower Amid Ongoing Smelter Maintenance
Read More
Copper Cathode Output Dips in May, June Forecast Slightly Lower Amid Ongoing Smelter Maintenance
Copper Cathode Output Dips in May, June Forecast Slightly Lower Amid Ongoing Smelter Maintenance
9 hours ago