Lin Yang ESS 5GWh Energy Storage System and Commercial & Industrial Integrated Cabinet Equipment Tender!

Published: Apr 24, 2025 09:01

Jiangsu Linyang Energy Storage Technology Co., Ltd. specializes in the integration of energy storage systems and the R&D, manufacturing, and sales of core equipment. The company relies on the entire industry chain layout of "energy storage PACK production, system integration, integrated solution sales, and power station operation," and has formed solution capabilities covering multiple application scenarios on the generation side, power grid side, and user side. In 2024, the company had a full order reserve both domestically and internationally, with projects covering China, Europe, Southeast Asia, the Middle East, and other regions. To meet the rapid development needs of the business, the company is now publicly sourcing from global suppliers and sincerely invites high-quality raw material/parts/complete machine suppliers to participate in cooperation.

The company is now conducting an open tender for the raw materials/parts/complete machines required for the 5GWh energy storage system's AC/DC side core equipment and 125KW/254KWh smart integrated cabinets for Jiangsu Linyang Energy Storage Technology Co., Ltd. in 2025, and welcomes new and old manufacturers or suppliers to participate in the bidding.

Scope of tender sourcing:

1.1, Tender type: Centralised procurement tender for the raw materials/parts/complete machines required for the 5GWh energy storage system's AC/DC side core equipment and 125KW/254KWh smart integrated cabinets for Jiangsu Linyang Energy Storage Technology Co., Ltd. domestically and internationally.

1.2, Tender content:

(1) Container-level equipment: containers, refrigeration systems, fire protection systems, pipeline systems, dehumidification devices, etc.

(2) RACK-level raw materials: liquid cooling plates, box covers, CCS, insulation pads, end plates, steel belts, connectors, BMS and its systems, etc.

(3) AC side equipment: PCS integrated machines.

Bidder qualification requirements:

2.1, Basic qualifications: Independent legal entities registered within the People's Republic of China, or overseas enterprises with international certification (equivalent qualification certificates need to be provided), possessing ISO 9001 quality management system certification, ISO 14001 environmental management system certification, and ISO 45001 occupational health management system certification.

2.2, Performance requirements: Industry leaders or those with sufficient performance in the energy storage industry and single projects exceeding 200MWh.

2.3, Technical and quality control capabilities: Independent technical R&D capabilities, detection capabilities, and quality control capabilities, able to provide highly reliable, safe, and cost-effective products.

2.4, Reputation and finance: No major quality accidents, litigation, or dishonesty records, with good corporate credit.

Registration time and contact information:

Registration deadline: Before May 8, 2025

Contact person: Manager Lu (Procurement Department)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Apr 3, 2026 13:46
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Read More
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Recently, the Binhe Haoyu 100MW/200MWh independent energy storage station in Zhucheng completed acceptance and entered commercial operation. The project was invested in by an energy storage industry fund jointly initiated by Corun, CALB, and Kaibo Capital. It was jointly developed by members of the large energy storage ecosystem consortium, including Corun, CALC, Goxia Technology, Duanrui Technology, and Star Energy New Energy. The station adopts a hybrid energy storage technology route combining "lithium iron phosphate + all-vanadium redox flow batteries," which can meet the grid's full-time-scale regulation needs while significantly reducing the lifecycle levelized cost of energy, enhancing overall system economy and safety, and maximizing operational efficiency and economic benefits.
Apr 3, 2026 13:46
ChuNeng Debuts 588Ah + CTP3.0 Module-Less Integration Solution
Apr 2, 2026 14:18
ChuNeng Debuts 588Ah + CTP3.0 Module-Less Integration Solution
Read More
ChuNeng Debuts 588Ah + CTP3.0 Module-Less Integration Solution
ChuNeng Debuts 588Ah + CTP3.0 Module-Less Integration Solution
On April 1, ChuNeng New Energy showcased its full-scenario energy storage solutions at the ESIE 2026 exhibition, demonstrating for the first time a 6.25MWh energy storage system solution based on the integration of 588Ah batteries and CTP3.0 module-less technology, attracting significant industry attention. As the industry's first solution deeply integrating 588Ah large-format cells with CTP3.0 module-less technology, it demonstrates unique value in dimensions such as system integration efficiency, thermal management safety, and large-scale application. Within the lithium iron phosphate system, the 588Ah battery achieves leading performance with a gravimetric energy density of 190Wh/kg, a volumetric energy density of 419Wh/L, and an energy efficiency of 96.5%.
Apr 2, 2026 14:18
Star Energy New Energy And Hithium Energy Storage Sign Strategic Cooperation Agreement
Apr 2, 2026 14:18
Star Energy New Energy And Hithium Energy Storage Sign Strategic Cooperation Agreement
Read More
Star Energy New Energy And Hithium Energy Storage Sign Strategic Cooperation Agreement
Star Energy New Energy And Hithium Energy Storage Sign Strategic Cooperation Agreement
On the first day of the ESIE 2026 Energy Storage Exhibition, Zhejiang Star Energy New Energy Technology Co., Ltd. and Xiamen Hithium Energy Storage Technology Co., Ltd. signed a "Strategic Cooperation Agreement." The two parties agreed to establish a strategic procurement partnership for cell products from 2026 to 2028, with an estimated total procurement volume of 30GWh over the next three years, laying a solid foundation for the large-scale expansion of the company's energy storage business. This cooperation represents an important choice made by both parties based on industrial trends, market opportunities, and a consensus on collaborative development. It also marks a new milestone for Star Energy New Energy in market development, business layout, and industrial synergy.
Apr 2, 2026 14:18