PV Glass Production Capacity Ramps Up with 1,200 mt/Day Furnace Launch in Anhui

Published: Mar 10, 2025 10:54
[PV Glass Furnace with 1,200 mt/Day Capacity Starts Production in Anhui Today] According to SMM, a new PV glass furnace with a capacity of 1,200 mt/day started production today in Anhui, operated by a new entrant in the PV glass industry. Additionally, in March, there is a plan to start production of another furnace with a capacity of 2,800 mt/day domestically, indicating a continuous increase in supply.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
2 hours ago
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Read More
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Recent 'EIA' data shows rooftop solar now makes up 20% of Puerto Rico's power capacity (1,456 MW), surpassing natural gas as the second-largest source. Between 2016 and 2025, distributed solar accounted for 81% of all new capacity. To combat frequent grid outages, residents have deployed over 171,000 battery systems (2,864 MWh), with many joining grid operator LUMA's virtual power plant ('VPP') program. Despite this progress, new legislation extended the territory's sole coal plant to 2032 and removed interim renewable targets, though the 100% goal for 2050 remains.
2 hours ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
3 hours ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
3 hours ago
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
10 hours ago
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Read More
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
The US solar industry faces a 53,000-worker shortfall as developers rush to meet the July 2026 construction deadline under the 'OBBBA'. Projections indicate 355,000 workers are needed to hit the 60-70 GW installation targets, yet 86% of employers report hiring difficulties. The labor crunch is compounded by a mandate requiring 15% of labor hours to come from apprentices to secure tax credits. To adapt, developers are building internal training pipelines, targeting veterans, and utilizing digital tools to maximize efficiency.
10 hours ago
[PV Glass Furnace with 1,200 mt/Day Capacity Starts Production in Anhu - Shanghai Metals Market (SMM)