Press Metal is set to grow in 2025 buoyed by demand recovery from China and alumina supply ease

Published: Jan 8, 2025 09:12
The New Year 2025 is expected to deliver strong financial and operational performance for Press Metal Aluminium Holdings Berhad, a Malaysia-based aluminium company with extensive global reach, thanks to the rising demand from China and reduced raw material costs due to increased alumina supply.

The New Year 2025 is expected to deliver strong financial and operational performance for Press Metal Aluminium Holdings Berhad, a Malaysia-based aluminium company with extensive global reach, thanks to the rising demand from China and reduced raw material costs due to increased alumina supply.

Press Metal is set to grow in 2025 buoyed by demand recovery from China and alumina supply ease

According to a report from UOB Kay Hian (UOBKH) Research, the resurgence in aluminium demand from China due to the economic stimulus package is set to substantially boost aluminium consumption, including that from Press Metal, leading to estimated business growth. Projected alumina price ease in the near future owing to increased supply from the resumption of Rio Tinto’s Australian refineries and new capacities in China, India, Guinea, and Indonesia will also support Press Metal’s profitability.

Projecting business growth for Press Metal, the research house has recommended a “buy” call with a target price of RM6.30 based on 28 times 2025 forward price earnings.

The investment firm highlighted the demand surge for value-added aluminium products, especially for wire rods and billets, also drove Press Metal’s sales, promoting the company to augment the production capacity of such products by 100,000 tonnes.

“With the expansion plan in motion, we anticipate value-added product volume to reach at least 60% of the company’s total sales volume by end-2025,” said Press Metal.

The Malaysian aluminium company will also have a secured alumina supply from its strategic joint venture with Indonesian parties signed in September 2024. The joint venture will set up an integrated refinery worth RM238bil with an initial capacity of 1 to 1.2 million tonnes.

Edited By:

Source: https://www.alcircle.com/news/press-metal-is-set-to-grow-in-2025-buoyed-by-demand-recovery-from-china-and-alumina-supply-ease-112940

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Aluminum Alloy 2606 Futures Drop 1.10%, ADC12 Spot Prices Lower Amid Sluggish Demand
23 mins ago
Aluminum Alloy 2606 Futures Drop 1.10%, ADC12 Spot Prices Lower Amid Sluggish Demand
Read More
Aluminum Alloy 2606 Futures Drop 1.10%, ADC12 Spot Prices Lower Amid Sluggish Demand
Aluminum Alloy 2606 Futures Drop 1.10%, ADC12 Spot Prices Lower Amid Sluggish Demand
[SMM Aluminum Alloy Daily Review] The most-traded cast aluminum alloy 2606 futures contract closed at 23,820 yuan/mt in the midday session today, down 265 yuan/mt, a decline of 1.10%. On the spot side, ADC12 market prices were generally lowered. Downstream buyers mainly made just-in-time procurement, and transactions were sluggish. Under the pattern of weak supply and demand on both sides, the price center continued to shift downward. Going forward, attention should be paid to aluminum price trends and marginal improvement on the demand side.
23 mins ago
Canyon Resources Initiates Trial Mining at Minim Martap Bauxite Project in Cameroon
2 hours ago
Canyon Resources Initiates Trial Mining at Minim Martap Bauxite Project in Cameroon
Read More
Canyon Resources Initiates Trial Mining at Minim Martap Bauxite Project in Cameroon
Canyon Resources Initiates Trial Mining at Minim Martap Bauxite Project in Cameroon
[SMM Aluminum Express News] Canyon Resources has mobilized the surface miner at the Daniel Plateau of its Minim Martap bauxite project in Cameroon. Trial mining operations are scheduled to commence this month (April 2026). First production remains on track for mid-Q2 2026. Upgrade works on the haul road to the Inland Rail Facility (IRF) are progressing as planned. The first seven locomotives were shipped from China at the end of March and are expected to arrive at the Port of Douala in late Q2 2026. The maiden bauxite trial shipment is now scheduled for Q3 2026, with full-scale shipments targeted for Q4 2026. Discussions are ongoing for Canyon to increase its stake in Camrail from 9.1% to over 20%, which would strengthen its control over the mine-to-port logistics chain.
2 hours ago
Alcoa Reports QoQ Decline in Alumina Output, Steady Aluminum Production Amid Middle East Disruptions
2 hours ago
Alcoa Reports QoQ Decline in Alumina Output, Steady Aluminum Production Amid Middle East Disruptions
Read More
Alcoa Reports QoQ Decline in Alumina Output, Steady Aluminum Production Amid Middle East Disruptions
Alcoa Reports QoQ Decline in Alumina Output, Steady Aluminum Production Amid Middle East Disruptions
[SMM Aluminum Express News] Alcoa alumina production fell 5% QoQ to 2.4 Mt (due to Australian maintenance), while aluminum output was steady at 607 kt. The company noted rerouting of millions of tons of refining capacity due to Middle East disruptions. Higher aluminum prices provided a ~$55M gain in the aluminum segment, offset by a ~$15M hit in alumina. Alcoa highlighted ongoing challenges from the Iran conflict on alumina supply chains.
2 hours ago
Press Metal is set to grow in 2025 buoyed by demand recovery from China and alumina supply ease - Shanghai Metals Market (SMM)