Mineral Resources expands Mt Marion with underground development

Published: Apr 19, 2024 17:30
Source: SMM
On 12 April, Mineral Resources (MinRes) announced the initiation of the preliminary development works for underground mining at the Mt Marion lithium operation in Western Australia.

On 12 April, Mineral Resources (MinRes) announced the initiation of the preliminary development works for underground mining at the Mt Marion lithium operation in Western Australia. The underground resource at Mt Marion has now doubled to 19.3 Mt at 1.22% Li2O, and a full underground study is targeted for completion by mid-2024.

The company plans to transition Mt Marion into an open pit and underground mining operation. Earlier this year, Chris Ellison, the Managing Director of MinRes said the tentative operation plan will be 20% underground and 80% open pit in the long run. He also provided an optimistic estimate of approximately 18 months until the start of the underground operation, targeting the year 2025.

Similarly, Liontown Resources, the owner of another Western Australian lithium project Kathleen Valley, announced in November 2023 that it had started firing blasts to create the underground portals at Mt Mann pit. The project is expected to come online in mid-2024.

Australian lithium miners are increasingly exploring underground mining options, which are expected to elevate or at least maintain Australian hard rock lithium cost curves in the foreseeable future. This shift is driven by the inherent higher-cost nature of underground mining, which arises from factors such as geological complexity, ore grades, and specific operational challenges. Like MinRes is to integrate products from both underground and open pit mining operations, it will be key to observe how miners will put forward strategies to cope with the uncertain market prices, its own upward production cost curves, and capital expenditures.

Author: Hongqiu Su | Battery Metals Analyst Associate | London Office, Shanghai Metals Market
Email: lilysu@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Analysis】 EV Sales Are No Longer the Sole Anchor of Power Battery Demand
14 hours ago
【SMM Analysis】 EV Sales Are No Longer the Sole Anchor of Power Battery Demand
Read More
【SMM Analysis】 EV Sales Are No Longer the Sole Anchor of Power Battery Demand
【SMM Analysis】 EV Sales Are No Longer the Sole Anchor of Power Battery Demand
14 hours ago
Nayuan Unveils Anode-Free Sodium-Ion Battery Prototype with 220 Wh/kg Energy Density
17 hours ago
Nayuan Unveils Anode-Free Sodium-Ion Battery Prototype with 220 Wh/kg Energy Density
Read More
Nayuan Unveils Anode-Free Sodium-Ion Battery Prototype with 220 Wh/kg Energy Density
Nayuan Unveils Anode-Free Sodium-Ion Battery Prototype with 220 Wh/kg Energy Density
[SMM, March 30] Technological iteration in the sodium-ion battery industry accelerated, and the anode-free route achieved a critical breakthrough. Recently, Nayuan New Materials Technology (Wuxi) Co., Ltd. officially released its NFS anode-free sodium-ion battery prototype product. The battery cell's measured energy density reached 220 Wh/kg, significantly higher than the industry's mainstream level of 120 Wh/kg, providing important technological support for sodium-ion batteries to break through performance bottlenecks and expand application scenarios.
17 hours ago
EVE Energy Plans To Invest 6 Billion Yuan To Build 60GWh Energy Storage And Power Battery Project
18 hours ago
EVE Energy Plans To Invest 6 Billion Yuan To Build 60GWh Energy Storage And Power Battery Project
Read More
EVE Energy Plans To Invest 6 Billion Yuan To Build 60GWh Energy Storage And Power Battery Project
EVE Energy Plans To Invest 6 Billion Yuan To Build 60GWh Energy Storage And Power Battery Project
On March 28, EVE Energy Co., Ltd. issued an announcement stating that the company plans to sign an investment cooperation agreement with the Management Committee of Huizhou Zhongkai High-tech Industrial Development Zone to invest in and construct the "EVE Energy 60GWh Energy Storage (Power) Battery Manufacturing Project" in the Zhongkai High-tech Zone. The total investment for this project is approximately 6 billion yuan, covering an area of about 500 mu. It will be used to construct a production base for energy storage (power) batteries with a capacity of 60GWh. The implementation entity for this project will be EVE Energy or an affiliated company established by it within the zone.
18 hours ago
Mineral Resources expands Mt Marion with underground development - Shanghai Metals Market (SMM)