Approval Granted for Ningxia Aluminum Electrolytic Aluminum Residue Lithium Extraction Project

Published: Mar 22, 2024 14:09
【Ningxia Aluminum Electrolytic Aluminum Residue Lithium Extraction Project Approved】Recently, the National Energy Investment Group's Ningxia Energy Aluminum Industry Technology Engineering Co., Ltd. announced the approval of a project to process and utilize 50,000 tons of electrolytic aluminum hazardous waste. The project is located within the existing plant area of the electrolytic aluminum waste residue landfill in the National Energy Aluminum Industry Technology Engineering Co., Ltd. in Qingtongxia Industrial Park, Wuzhong City, Ningxia Province. The project will mainly construct one large slag (carbon slag) processing production line and one lithium carbonate recovery production line, capable of producing 56,997.36t/a of recycled refractory materials and 575t/a of crude lithium carbonate annually.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
6 hours ago
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
Read More
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
CMOC: 2025 Net Profit up 50.3% YoY, Copper Production at 741,100 mt; Niobium, Cobalt, Molybdenum, and Tungsten Output Exceeded Expectations
6 hours ago
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
23 hours ago
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
Read More
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
[SMM Weekly Manganese Ore Review] Initial Overseas Market Offers Raised, Intensifying the Tug-of-War Between Strong Expectations and Weak Reality in the Manganese Ore Market
March 27 News: Northern ports: South African high-grade ore was 36-37.9 yuan/mtu, up WoW from last Friday; South African semi-carbonate was 43.5-44 yuan/mtu, up WoW from last Friday; Gabon ore was 47.3-47.9 yuan/mtu, up WoW from last Friday; 46% Australian lumps were 48-48.5 yuan/mtu, up WoW from last Friday. South China ports: South African high-grade ore was 34.5-35 yuan/mtu, flat WoW from last Friday; South African semi-carbonate was 38.8-39.5 yuan/mtu, up WoW from last Friday; Gabon ore was 44-44.5 yuan/mtu, up WoW from last Friday; 46% Australian lumps were 45.2-45.7 yuan/mtu, up WoW from last Friday.
23 hours ago
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
23 hours ago
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Read More
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Samsung SDI Signed a 1.6 Trillion Won Battery Materials Contract with South Korean Cathode Materials Manufacturer L&F
Starting in 2027, L&F will supply LFP battery cathode materials to Samsung SDI for three consecutive years.
23 hours ago
【Ningxia Aluminum Electrolytic Aluminum Residue Lithium Extraction Pro - Shanghai Metals Market (SMM)