Grid Delay, Price Volatility, Delivery Pressure — Join SMM's Munich Solar & Storage Forum in June to Navigate Challenges

Published: Jun 10, 2026 16:18

Europe's renewable energy market is undergoing structural acceleration in 2026. Utility-scale storage projects are breaking ground at pace, and solar installations continue to expand — but supply chain pressures are intensifying in parallel. Lithium carbonate price swings have yet to fully transmit through to system-level pricing, and the cost mechanisms across the cell and integration layers are still being recalibrated. At the same time, grid connection queues in Europe are lengthening, permitting timelines are growing less predictable, and project delivery schedules are under real strain. How Chinese supply chains respond to Europe's shifting market structure, and how European developers balance cost pressure with project momentum, have become defining questions for the entire value chain.

To address these challenges head-on, SMM is hosting the 2026 SMM Germany Solar & Energy Storage Forum on 23 June 2026 in Munich, running alongside Intersolar Europe & ESS Europe. The forum brings together senior industry leaders from GCL, LONGi, Gokin Solar, Farasis Energy, Verkor, Greenvolt Power, AKU-BAT CZ, RES Group, Power Capital Renewable Energy, and more, for a focused dialogue on European ESS project realities, China's PV supply chain dynamics, and the path forward for China-Europe collaboration.


Venue: Hotel Novotel München Messe, Munich, Germany

Date: 23 June 2026 | 14:00–18:0

Forum details: https://www.metal.com/events/conferences/2026-SMM-Germany-Solar--Energy-Storage-Forum/969

Register for free: https://bd.smm.cn/s/HDq2UoEI

For enquiries, please contact: Joanne Xu | +86 150 0197 5312 | joannexu@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Energy Storage: BYD Energy Storage Assists In Official Operation Of Hungary's Largest Battery Energy Storage Project]
Common.Time.minsAgo
[Energy Storage: BYD Energy Storage Assists In Official Operation Of Hungary's Largest Battery Energy Storage Project]
Read More
[Energy Storage: BYD Energy Storage Assists In Official Operation Of Hungary's Largest Battery Energy Storage Project]
[Energy Storage: BYD Energy Storage Assists In Official Operation Of Hungary's Largest Battery Energy Storage Project]
Recently, the largest battery energy storage project in Hungary, invested and constructed by Greenvolt Power, was officially put into operation, and an inauguration ceremony was held at the project site. The project has a scale of 99.8MW/288.6MWh, with BYD Energy Storage providing 288.6MWh of its Cube Battery Energy Storage System. Following its operation, this project will significantly enhance the regulation capability and power supply reliability of the local grid, support the large-scale grid integration of renewable energy in Hungary and the Central and Eastern European region, and accelerate the green transformation of the local energy structure.
Common.Time.minsAgo
[Energy Storage: Energy Storage Projects Accelerate Construction In Jiuquan, Gansu Province]
Jun 12, 2026 11:49
[Energy Storage: Energy Storage Projects Accelerate Construction In Jiuquan, Gansu Province]
Read More
[Energy Storage: Energy Storage Projects Accelerate Construction In Jiuquan, Gansu Province]
[Energy Storage: Energy Storage Projects Accelerate Construction In Jiuquan, Gansu Province]
Recently, the Jinta Baishuiquan 300MW/1200MWh grid-side independent energy storage station project of Gansu Jiuquan Jinchu New Energy Co., Ltd. is accelerating construction. This project is invested in and constructed by Jiuquan Jinchu New Energy Co., Ltd., a subsidiary of Beijing Hyperstrong Technology Co., Ltd., with a total investment of 900 million yuan. It is a planned integrated construction project for the first phase. The project will build a new 330kV booster station, connecting to the regional power grid through a combination of overhead lines and cables, with a total line length of 0.803 kilometers. The project plans for a total of 60 energy storage units of 5MW/20MWh each, along with complete supporting converter, substation, distribution, and secondary control equipment.
Jun 12, 2026 11:49
Korea Zinc Secures Grid Connection Approval for Australian ESS Project
Jun 11, 2026 10:00
Korea Zinc Secures Grid Connection Approval for Australian ESS Project
Read More
Korea Zinc Secures Grid Connection Approval for Australian ESS Project
Korea Zinc Secures Grid Connection Approval for Australian ESS Project
Korea Zinc announced on June 5 that its Australian subsidiary Ark Energy has secured grid connection approval for the Richmond Valley solar and ESS project. The Richmond Valley project involves building a 2,200 MWh ESS and a 200 MW solar power plant in the Richmond Valley region of New South Wales, Australia.
Jun 11, 2026 10:00