【SMM Aluminum Flash News】Lubei Haisheng Launches $455M Green Aluminum Project, Aiming for 1M Tons Annual Production

Published: Apr 6, 2026 14:07
On March 31, the commissioning ceremony for the green technological upgrading project of aluminum-based new materials of Shandong Lubei Haisheng Biotechnology Co., Ltd. was held at the project site. This project is a key initiative of Lubei Group to promote green industrial transformation and address key capacity gaps. Since its commencement in 2024, it has accumulated an investment of 455 million yuan. Upon full operation, the project will save 128,000 tons of standard coal equivalent in energy consumption annually, significantly improving resource utilization and further solidifying the company's foundation for an annual alumina production capacity of 1 million tons.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
Common.Time.hoursAgo
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
Read More
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
Metro Mining Resumes Bauxite Hills Operations Post-Cyclone, Targets 6.6-7.1M WMT in 2026
[SMM Aluminum Express News] Metro Mining (ASX:MMI) resumed operations at Bauxite Hills in mid-March after Tropical Cyclone Narelle caused minimal disruption, with only seven days of lost production and no infrastructure damage. The Port of Skardon reopened on 25 March, with barging gradually returning to full capacity by mid-April. Despite the disruption, 100,000 WMT was shipped in March. Transhipping continues via TSA Skardon Floating Crane and ultramax vessels, while the Ikamba Offshore Floating Terminal is en route back from maintenance in Batam and expected to arrive end-April. Full-year 2026 shipments are forecast at 6.6–7.1 million WMT.
Common.Time.hoursAgo
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
Common.Time.hoursAgo
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
Read More
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
SHFE Cast Aluminum Alloy Warrants Drop to 31,183 mt on April 7
[SMM Express] SHFE data showed that on April 7, the total registered cast aluminum alloy warrants stood at 31,183 mt, a decrease of 453 mt from the previous trading day. Specifically, the total registered volume in Shanghai was 1,912 mt (down 30 mt), Guangdong 12,358 mt (down 121 mt), Jiangsu 3,602 mt (down 30 mt), Zhejiang 8,471 mt (down 272 mt), Chongqing 3,634 mt (unchanged), and Sichuan 1,206 mt (unchanged).
Common.Time.hoursAgo
Data: SHFE, DCE market movement (Apr 07)
Common.Time.hoursAgo
Data: SHFE, DCE market movement (Apr 07)
Read More
Data: SHFE, DCE market movement (Apr 07)
Data: SHFE, DCE market movement (Apr 07)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 07 Apr , 2026
Common.Time.hoursAgo