SMM Daily Review: Spot Lithium Carbonate Prices Fluctuated Upward on March 13

Published: Mar 13, 2026 17:28
[SMM Daily Review: Spot Lithium Carbonate Prices Fluctuated Upward on March 13]

SMM's battery-grade lithium carbonate index price fluctuated upward from the previous working day. Futures trend, the most-traded contract fluctuated higher after opening and once climbed to around 163,000 yuan/mt; after the midday session, the price reversed downward and once fell to 150,000 yuan/mt near the close, then fluctuated rangebound at low levels until the close. As of the close, open interest for the day decreased by about 8,500 lots from the previous trading day.

Actual transactions, upstream lithium chemical plants showed a clear reluctance to sell and held prices firm, while willingness to sell spot orders remained weak; downstream material plants still mainly stayed cautious and on the sidelines, maintaining only just-in-time procurement. Overall, both market inquiries and actual transactions were sluggish.

As for subsequent price movements, given that downstream procurement sentiment remained cautious and the market lacked sustained momentum to chase higher prices, lithium carbonate prices were expected to continue a fluctuating trend in the short term.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
1 hour ago
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
Read More
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] On March 12, 2026, the US International Trade Commission (ITC) ruled against imposing tariffs on graphite imports from China. Below is the complete timeline of the US anti-dumping and countervailing duty (AD/CVD) investigation into China’s active anode material (graphite anode) imports, the duty rates at each stage, and the latest outcome as of March 12, 2026.
1 hour ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Common.Time.hoursAgo
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Read More
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Recently, the National Development and Reform Commission (NDRC) issued the Reply on the Approval of the Hami–Dunhuang Third 750 kV Transmission Line Project, formally approving the Xinjiang Hami–Dunhuang Third 750 kV Transmission Line Project. The implementation of this project was of great significance for improving the backbone structure of the main power grid in Northwest China, strengthening the mutual support capacity between the Gansu and Xinjiang power grids, and enhancing Xinjiang’s capacity to absorb new energy. According to previously disclosed environmental impact assessment information, the project had a total static investment of 1.3509 billion yuan and was scheduled for completion in March 2027.
Common.Time.hoursAgo
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Common.Time.hoursAgo
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Read More
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
On March 12, it was learned from State Grid Jilin Electric Power Co., Ltd. that the project to transmit power from the Songliao Clean Energy Base in Northeast China to North China (the “Jijing UHV DC Project”) officially entered the final stage of the feasibility study. According to the plan, the project is expected to complete project approval in 2026, enter the substantive construction phase in 2027, and be completed and put into operation in 2029.
Common.Time.hoursAgo