Breakthrough Achieved in Magnesium-Air Battery Technology; Lithium Mine Project in British Columbia, Canada Suspended Due to Litigation [SMM Survey]

Published: Mar 11, 2026 14:08
The University of Tsukuba in Japan successfully developed a new-type magnesium-air solid-state battery, using a nitrogen-doped porous graphene cathode to solve the problem of chloride corrosion, providing a high-safety, low-cost technological pathway for flexible electronics and wearable devices. At the same time, the Record Ridge magnesium mine project in British Columbia, Canada, has triggered strong opposition from the local tourism community over plans to transport ore to China for processing, and has been halted by litigation, with a court hearing scheduled for March 10. The two developments respectively highlight magnesium’s cutting-edge applications in new energy technology and the real-world tensions in resource development.

Japan Develops Magnesium-Air Solid-State Battery: Graphene Cathode Solves Chloride Corrosion Challenge

A research team at the University of Tsukuba in Japan recently developed a new-type all-solid-state magnesium-air battery. Using nitrogen-doped porous graphene in place of conventional platinum-based cathodes, together with a solid polymer electrolyte containing magnesium chloride, the team successfully resolved the chloride corrosion issue that has long plagued magnesium-air batteries.

Magnesium-air batteries use oxygen in the air as the active material of the positive electrode, and their theoretical energy density was comparable to that of lithium-air batteries. However, in traditional designs, chloride ions in the electrolyte triggered internal chlorination reactions, leading to degradation of key components. By constructing a nitrogen-doped porous graphene structure, the research team enabled it to withstand chloride ion attack while maintaining high catalytic activity. The structure also provided storage space for discharge products, ensuring efficient material transport within the air battery.

Performance tests showed that the new system outperformed comparable batteries using platinum cathodes. The solid electrolyte design eliminated the risk of liquid electrolyte leakage, and even when bent to 120 degrees, it maintained its initial performance without leakage, demonstrating potential for applications in flexible electronics and wearable devices.

Magnesium resources are far more abundant than lithium and platinum, helping reduce supply chain risks. The study provided a viable technical pathway for developing low-cost, high-safety rechargeable magnesium-air batteries, and the findings were published in Advanced Functional Materials.

 

Magnesium Mine in British Columbia, Canada, to Be Shipped to China for Processing, Tourism Town Files Lawsuit to Halt Project

The Record Ridge magnesium mine project near Rossland, British Columbia, Canada, has sparked major controversy. Developer WHY Resources has obtained a mining permit and is expected to ship the mined magnesium ore through US ports to Yulin, China, for processing, where 20 of global magnesium supply capability is concentrated. The project has an annual capacity of 63,500 mt, but all ore will be exported rather than processed within Canada.

This has intensified tensions with the local tourism economy. Rossland achieved economic transformation by relying on Red Mountain Resort, with annual tourism revenue exceeding $40 million. Opponents warned that mining dust would threaten public health and damage world-class mountain biking trails. A local merchant group, Save Record Ridge Action Committee, has already filed a lawsuit seeking an environmental assessment and a suspension of project development. The court will hold a hearing on March 10.

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Baiyin Nonferrous Plans to Sell 33 Tons of Crude Selenium via Bidding, Minimum Premium at 10,500 RMB/ton
Common.Time.minsAgo
Baiyin Nonferrous Plans to Sell 33 Tons of Crude Selenium via Bidding, Minimum Premium at 10,500 RMB/ton
Read More
Baiyin Nonferrous Plans to Sell 33 Tons of Crude Selenium via Bidding, Minimum Premium at 10,500 RMB/ton
Baiyin Nonferrous Plans to Sell 33 Tons of Crude Selenium via Bidding, Minimum Premium at 10,500 RMB/ton
SMM March 11 News: According to official sources from Baiyin Nonferrous Group Co., Ltd., the company plans to sell 33 tons of crude selenium. The pricing mechanism will be based on bidding for the premium/discount. The minimum premium is set at 10,500 RMB/ton. This project requires three registered participants to proceed with the bidding. The registration deadline is 5:00 PM on March 16, 2026, and the bidding is scheduled to start at 3:00 PM on March 17, 2026. Given the recent positive trading conditions for crude selenium tenders, with relatively high transaction prices, market insiders anticipate that the outcome of this premium bidding will be worth watching.
Common.Time.minsAgo
Baiyin Nonferrous Group Co., Ltd. Conducted a Competitive Bid Sale of 33 mt of Crude Selenium on the 11th [SMM Selenium Report]
Common.Time.minsAgo
Baiyin Nonferrous Group Co., Ltd. Conducted a Competitive Bid Sale of 33 mt of Crude Selenium on the 11th [SMM Selenium Report]
Read More
Baiyin Nonferrous Group Co., Ltd. Conducted a Competitive Bid Sale of 33 mt of Crude Selenium on the 11th [SMM Selenium Report]
Baiyin Nonferrous Group Co., Ltd. Conducted a Competitive Bid Sale of 33 mt of Crude Selenium on the 11th [SMM Selenium Report]
Common.Time.minsAgo
Baiyin Nonferrous Group Initiates Tender for 100 Tons of Crude Cadmium, Bidding Starts March 17, 2026
Common.Time.minsAgo
Baiyin Nonferrous Group Initiates Tender for 100 Tons of Crude Cadmium, Bidding Starts March 17, 2026
Read More
Baiyin Nonferrous Group Initiates Tender for 100 Tons of Crude Cadmium, Bidding Starts March 17, 2026
Baiyin Nonferrous Group Initiates Tender for 100 Tons of Crude Cadmium, Bidding Starts March 17, 2026
SMM March 11 News: According to SMM, the Northwest Lead and Zinc Smelter of Baiyin Nonferrous Group Co., Ltd. has initiated a public tender for the sale of approximately 100 tons of its crude cadmium. Specifically, according to official sources, the bidding base price is set at the SMM average price minus 500 RMB/ton, and the highest bidder will win the tender. This project requires three registered participants to proceed with the bidding. The registration deadline is 5:00 PM on March 16, 2026, and the bidding is scheduled to start at 10:00 AM on March 17, 2026.
Common.Time.minsAgo
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here