1. Procurement Conditions
The procurement entity for this procurement project, Metallurgical Machinery March 2026 Non-Ferrous Metal Copper Powder Procurement (AGZYFZHHD260310272880), was Angang Group Zhongyuan Industrial Development Co., Ltd. The project funds were self-raised, and the project had met the procurement conditions. It was now conducting a public single-round negotiation.
2. Project Overview and Procurement Scope
2.1 Project Name: Metallurgical Machinery March 2026 Non-Ferrous Metal Copper Powder Procurement
2.2 Alternative Procurement Method Upon Procurement Failure: No change
2.3 For the contents, scope, and scale of this project procurement, please refer to the attachment Material List Attachment.pdf.
3. Bidder Qualification Requirements
3.1 Consortium bidding was not permitted for this procurement.
3.2 This procurement required bidders to have the following qualification requirements:
(1) Trading business license
(2) Manufacturing business license
3.3 This procurement required bidders to meet the following registered capital requirements:
Registered capital for manufacturers: RMB 600,000 and above
Registered capital for trading entities: RMB 600,000 and above
3.4 This procurement required bidders to have the following performance requirements:
Please refer to the attachment (if required)
3.5 This procurement required bidders to have the following capability requirements, financial requirements, and other requirements:
Financial requirements: Please refer to the attachment (if required)
Capability requirements: Please refer to the attachment (if required)
Other requirements: Distributors were required to provide authorization letters from manufacturers or processing enterprises
3.6 For projects that were legally required to undergo tendering, bids submitted by dishonest persons subject to enforcement were invalid.
4. Acquisition of Procurement Documents
4.1 All interested bidders should log in to the Ansteel Smart Tender and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents from 17:00 on March 10, 2026 to 13:00 on March 16, 2026 (Beijing time, the same hereinafter).
Click to View Tender Details:
![Delivery Logic Dominated the Market, Coupled With a Widening Price Spread Between Futures Contracts; Shanghai Spot Copper Maintained a Premium [SMM Shanghai Spot Copper]](https://imgqn.smm.cn/usercenter/HfIIS20251217171709.jpg)

![Falling Inventory Coupled With a Still-Wide Price Spread Between Futures Contracts Drove Spot Premiums Sharply Higher [SMM South China Spot Copper]](https://imgqn.smm.cn/usercenter/qBqQv20251217171708.jpg)
