National Bureau of Statistics: Raw Coal Production of Industrial Enterprises Above Designated Size Maintained a High Level in May, Crude Oil Production Grew Steadily, and Electricity Production Growth Accelerated

Published: Jun 16, 2026 11:00

According to data from the National Bureau of Statistics (NBS), in May, raw coal production at industrial enterprises above the designated size (hereafter, large industrial enterprises) remained at a relatively high level, crude oil production grew steadily, natural gas production edged down, and power generation growth picked up.

1. Raw Coal, Crude Oil, and Natural Gas Production and Related Conditions

Raw coal production remained at a relatively high level. In May, large industrial enterprises produced 400 million mt of raw coal, down 1.7% YoY, with a daily average production of 12.81 million mt.

From January to May, raw coal production at large industrial enterprises reached 1.98 billion mt, down 0.3% YoY.

Crude oil production grew steadily. In May, large industrial enterprises produced 18.57 million mt of crude oil, up 0.5% YoY, with growth slowing by 0.7 percentage points from April; daily average production was 599,000 mt.

From January to May, crude oil production at large industrial enterprises totaled 91.31 million mt, up 1.1% YoY.

The decline in crude oil processing widened. In May, large industrial enterprises processed 53.72 million mt of crude oil, down 9.1% YoY, with the decline expanding by 3.3 percentage points from April; daily average processing volume was 1.733 million mt.

From January to May, crude oil processed at large industrial enterprises reached 292.8 million mt, down 2.2% YoY.

Natural gas production edged down. In May, large industrial enterprises produced 21.7 billion m³ of natural gas, down 2.2% YoY, compared to a 1.9% increase in April; daily average production was 700 million m³.

From January to May, natural gas production at large industrial enterprises amounted to 111.7 billion m³, up 1.7% YoY.

2. Power Generation

Power generation growth at large industrial enterprises accelerated. In May, power generation at large industrial enterprises reached 784.3 billion kWh, up 4.2% YoY, with growth accelerating by 1.6 percentage points from April; daily average generation was 25.3 billion kWh. From January to May, power generation at large industrial enterprises totaled 3,912.9 billion kWh, up 3.6% YoY.

By type, in May, growth in thermal power at large industrial enterprises slowed, while growth in hydropower and solar power accelerated, and nuclear and wind power shifted from decline to growth. Specifically, thermal power at large industrial enterprises grew 2.1% YoY, with growth slowing by 1.0 percentage point from April; hydropower increased by 13.0%, with growth accelerating by 0.8 percentage points; nuclear power grew 5.0%, compared to an 8.7% decline in April; wind power edged up 0.5%, reversing a 5.0% drop in April; and solar power rose 12.1%, with growth accelerating by 5.0 percentage points.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Updates Mineral Resources Law, Adding Lead, Zinc to Strategic Minerals List
Common.Time.minsAgo
China Updates Mineral Resources Law, Adding Lead, Zinc to Strategic Minerals List
Read More
China Updates Mineral Resources Law, Adding Lead, Zinc to Strategic Minerals List
China Updates Mineral Resources Law, Adding Lead, Zinc to Strategic Minerals List
[Lead-Zinc Ore Market Dynamics] It is reported that the Regulations for the Implementation of the Mineral Resources Law of the People's Republic of China were adopted at the 85th Executive Meeting of the State Council on May 9, 2026, and came into force on June 15, 2026. The Regulations officially include 36 types of critical minerals such as lead and zinc, rare earths, lithium, cobalt, gallium, and germanium in the national catalog of strategic mineral resources.
Common.Time.minsAgo
[Lithium Mine: Hualian Holdings' Arizaro Lithium Mine Acquisition Extended To August, Transaction Awaiting ODI Approval]
1 hour ago
[Lithium Mine: Hualian Holdings' Arizaro Lithium Mine Acquisition Extended To August, Transaction Awaiting ODI Approval]
Read More
[Lithium Mine: Hualian Holdings' Arizaro Lithium Mine Acquisition Extended To August, Transaction Awaiting ODI Approval]
[Lithium Mine: Hualian Holdings' Arizaro Lithium Mine Acquisition Extended To August, Transaction Awaiting ODI Approval]
On June 21, Hualian Holdings Co., Ltd. disclosed the progress of the Arizaro project transaction. As the transaction is still in the process of fulfilling overseas investment approval procedures, the buyer and seller negotiated and signed an "Extension Agreement," extending the deadline for the share purchase agreement to August 20, 2026. This further extension is due to the impending expiration of the deadline stipulated in the original agreement, while the ODI approval process is still ongoing. According to the extension agreement, if the transaction has not been completed by August 20, the deadline will be automatically extended to October 20, 2026, without the need for both parties to sign additional documents.
1 hour ago
[Lithium Battery: Dynanonic Plans To Raise 2.9 Billion Yuan For Integrated Lithium Battery New Materials Project]
1 hour ago
[Lithium Battery: Dynanonic Plans To Raise 2.9 Billion Yuan For Integrated Lithium Battery New Materials Project]
Read More
[Lithium Battery: Dynanonic Plans To Raise 2.9 Billion Yuan For Integrated Lithium Battery New Materials Project]
[Lithium Battery: Dynanonic Plans To Raise 2.9 Billion Yuan For Integrated Lithium Battery New Materials Project]
On June 18, Shenzhen Dynanonic Co., Ltd. disclosed a plan for a private placement of shares to specific qualified investors in 2026. The company plans to issue shares to no more than 35 qualified investors, raising a total amount not exceeding 2.9 billion yuan. The primary investment project for this private placement is the Integrated Lithium Battery New Materials (Phase I) project, which is the 200,000 tons/year advanced phosphate materials project. The implementing entity for this project is Qujing Zhanyi Dynanonic Technology Co., Ltd., with an estimated construction period of 24 months. The project will add a new annual production capacity of 200,000 tons of next-generation high-compaction advanced phosphate materials.
1 hour ago