[SMM Analysis] China's Ferrochrome Imports to Stay Low in the Short Term after Falling in May

Published: Jun 22, 2026 17:25

News, June 22, 2026:

According to China Customs statistics, China’s total imports of high-carbon ferrochrome reached 131,000 tonnes in May 2026, falling 9.7% month-on-month and 15.62% year-on-year.

  • Imports from South Africa stood at 10,000 tonnes, down 71.45% month-on-month and 37.18% year-on-year;
  • Imports from Kazakhstan hit 84,700 tonnes, rising 10.18% month-on-month while slipping 13.87% year-on-year.

From January to May 2026, China’s cumulative imports of high-carbon ferrochrome totalled 677,900 tonnes, a year-on-year drop of 45.5%.

  • Cumulative imports from South Africa: 100,100 tonnes, plunging 83.0% year-on-year;
  • Cumulative imports from Kazakhstan: 395,600 tonnes, edging down 9.9% year-on-year.

South Africa's preferential electricity tariff of 0.62 rand per kWh has officially obtained approval from Nersa. Top ferrochrome producer Glencore-Merafe has withdrawn the clause involving 189 job cuts. Although South Africa's ferrochrome sector has entered full production resumption, output has not seen a notable jump, with monthly ferrochrome exports remaining at a relatively low range of 70,000–100,000 tonnes. Kazakhstan maintains steady production with limited fluctuations in its ferrochrome exports and supply volume. On the whole, China's ferrochrome imports will stay at a low and stable level in the short run.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis: 2026 Manganese Alloy Market Review & Outlook]
1 hour ago
[SMM Analysis: 2026 Manganese Alloy Market Review & Outlook]
Read More
[SMM Analysis: 2026 Manganese Alloy Market Review & Outlook]
[SMM Analysis: 2026 Manganese Alloy Market Review & Outlook]
The 2026 H1 manganese market trended up first and down later, with high-level volatility driven by persistent friction between rigid high-cost support and weak terminal demand. The H2 market is poised for cost-supported limited recovery. Firm overseas ore prices will underpin the market, while high port inventories cap upside. Silicomanganese prices are expected to trend higher on production cuts and destocking, with rebound room constrained by demand recovery progress.
1 hour ago
ADC12 prices generally stable with slight rise, domestic-overseas inversion continues to repair [ADC12 Price Daily Review]
Jul 7, 2026 14:01
ADC12 prices generally stable with slight rise, domestic-overseas inversion continues to repair [ADC12 Price Daily Review]
Read More
ADC12 prices generally stable with slight rise, domestic-overseas inversion continues to repair [ADC12 Price Daily Review]
ADC12 prices generally stable with slight rise, domestic-overseas inversion continues to repair [ADC12 Price Daily Review]
[ADC12 Price Daily: ADC12 Prices Generally Stable with Slight Rise, Inverted Domestic-Overseas Spread Continues to Narrow] Quotes in the secondary aluminum alloy market predominantly held steady with a slight rise today. The SMM ADC12 price increased by 50 yuan/mt from the previous trading day to 24,050 yuan/mt. The rebound in aluminum prices and high cost-side operations remained key factors supporting enterprise quotes. Tight supply of aluminum scrap and persistently high procurement costs kept enterprises' willingness to cut prices low.
Jul 7, 2026 14:01
Luzhou Generation-Grid-Load-Storage Integrated Energy Project (Phase I) PV Module Procurement Second Failed Bidding
Jul 7, 2026 13:30
Luzhou Generation-Grid-Load-Storage Integrated Energy Project (Phase I) PV Module Procurement Second Failed Bidding
Read More
Luzhou Generation-Grid-Load-Storage Integrated Energy Project (Phase I) PV Module Procurement Second Failed Bidding
Luzhou Generation-Grid-Load-Storage Integrated Energy Project (Phase I) PV Module Procurement Second Failed Bidding
On July 2, the tender failure announcement for the PV module procurement (the second tender) of the Luzhou Generation-Grid-Load-Storage Integrated Energy Project (Phase I) was released. The announcement disclosed that the second tender was opened on June 30, 2026. As fewer than three bidders submitted the bid security, this tender failed. The section will be re-tendered in accordance with regulations. Previously, when this section was opened on May 22, 2026, it also failed because fewer than three bidders submitted bids.
Jul 7, 2026 13:30