A Panoramic View of Solid-State Battery Anodes: The Triple Game of Technology, Capacity, and Market

Published: Feb 9, 2026 22:06
The industrialization of solid-state battery anodes follows a clear technological progression, closely linked to the maturity of the electrolyte system: first, compatibility and improvement—silicon-based/composite anodes; second, upgrading and breakthroughs—pre-lithiation/composite lithium metal anodes; and third, the ultimate goal—pure lithium metal anode capacity deployment.

The industrialization of solid-state battery anodes follows a clear technological progression, closely linked to the maturity of the electrolyte system: first, compatibility and improvement—silicon-based/composite anodes; second, upgrading and breakthroughs—pre-lithiation/composite lithium metal anodes; and third, the ultimate goal—pure lithium metal anode capacity deployment.

 

According to SMM forecasts, all-solid-state battery shipments will reach 13.5 GWh by 2028, while semi-solid-state battery shipments will reach 160 GWh. Global lithium-ion battery demand is projected to reach approximately 2,800 GWh by 2030, with the EV sector's lithium-ion battery demand showing a CAGR of around 11% from 2024 to 2030, ESS lithium-ion battery demand at a CAGR of about 27%, and consumer electronics lithium battery demand at a CAGR of roughly 10%. Global solid-state battery penetration is estimated at about 0.1% in 2025, with all-solid-state battery penetration expected to reach around 4% by 2030, and global solid-state battery penetration potentially approaching 10% by 2035.

**Note:** For further details or inquiries regarding solid-state battery development, please contact:
Phone: 021-20707860 (or WeChat: 13585549799)
Contact: Chaoxing Yang. Thank you!

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
MGL Plans To Build An Annual 30,000-Ton Lithium-Ion Battery Cathode Material Project
Common.Time.minsAgo
MGL Plans To Build An Annual 30,000-Ton Lithium-Ion Battery Cathode Material Project
Read More
MGL Plans To Build An Annual 30,000-Ton Lithium-Ion Battery Cathode Material Project
MGL Plans To Build An Annual 30,000-Ton Lithium-Ion Battery Cathode Material Project
On February 9, MGL announced that the company plans to invest 929 million yuan to build an annual 30,000-ton lithium-ion battery cathode material project. The first phase will involve an investment of 737 million yuan, while the second phase will require 192 million yuan. The project is expected to achieve an annual production capacity of 5,000 tons of high-voltage lithium cobalt oxide, 10,000 tons of NCA material, and 15,000 tons of ultra-high nickel ternary material. The total construction period for the project is 36 months, divided into two phases: the first phase will take 21 months, and the second phase will take 15 months.
Common.Time.minsAgo
Easpring And ProLogium Sign A Cooperation Framework Agreement On Solid-State Batteries
Common.Time.minsAgo
Easpring And ProLogium Sign A Cooperation Framework Agreement On Solid-State Batteries
Read More
Easpring And ProLogium Sign A Cooperation Framework Agreement On Solid-State Batteries
Easpring And ProLogium Sign A Cooperation Framework Agreement On Solid-State Batteries
On February 9, Easpring announced that the company and ProLogium signed the "Strategic Cooperation Framework Agreement" on February 6. Both parties intend to strengthen cooperation in the fields of solid-state batteries and the new energy industry, leveraging their respective technological advantages to establish a comprehensive strategic partnership in areas such as equity investment, battery material cooperation, product mass production, and supply. This is expected to accelerate the adoption and performance optimization of the company's solid-state battery materials and foster a synergistic and mutually beneficial industrial ecosystem with downstream customers, jointly advancing the mass production process of all-solid-state batteries.
Common.Time.minsAgo
【SMM New Energy】PLS Signs Spodumene Offtake Deal with Canmax, Sets USD1000/t Floor Price and Secures USD100M Prepayment
1 hour ago
【SMM New Energy】PLS Signs Spodumene Offtake Deal with Canmax, Sets USD1000/t Floor Price and Secures USD100M Prepayment
Read More
【SMM New Energy】PLS Signs Spodumene Offtake Deal with Canmax, Sets USD1000/t Floor Price and Secures USD100M Prepayment
【SMM New Energy】PLS Signs Spodumene Offtake Deal with Canmax, Sets USD1000/t Floor Price and Secures USD100M Prepayment
PLS announced that it has entered into a 2-year spodumene concentrate offtake agreement with Canmax Technologies, covering annual supply of 150kt, with an option to extend the agreement for an extra 12 months. The agreement sets a floor price of USD1,000/t on an SC6 basis, with no upside price cap, providing downside protection while retaining full exposure to price increases. Meanwhile, Canmax will provide a USD100 million unsecured, interest-free prepayment, which will be offset against future spodumene deliveries. Supply is scheduled to commence in 2026, subject to receipt of the prepayment, with material sourced from PLS’ Pilgangoora operation. The agreement is expected to enhance PLS’ near-term liquidity while maintaining production and sales flexibility through optional volumes.
1 hour ago