The upward momentum for wafer prices is relatively strong, and the transaction prices of solar cells have risen [SMM Silicon-based PV Morning Meeting Summary]

Published: Jul 15, 2025 09:14
[SMM Silicon-Based PV Morning Meeting Summary: Strong Upward Momentum in Wafer Prices, Transaction Prices of Solar Cells Rise] Wafer: The market price for N-type 18X wafers is 1 yuan/piece; the price for 210R wafers is 1.15 yuan/piece. Wafer prices have stabilized at current quotes, with widespread market transactions. Solar cell plants are actively picking up goods, and some producers indicate that there is still some upward momentum for price increases in the future. Solar cell: The transaction price for Topcon 183N solar cells (with 25% efficiency or higher) ranges from 0.23 to 0.245 yuan/W; the transaction price for Topcon 210RN and 210N solar cells ranges from 0.24 to 0.26 yuan/W.

SMM reported on July 15:

Wafer

Prices: The market price for N-type 18X wafers is 1 yuan/piece; the price for 210R wafers is 1.15 yuan/piece. Wafer prices have stabilized at current levels, with widespread market transactions. Solar cell plants are actively picking up goods, and some producers indicate there is still upward momentum for price increases.

Production: Domestic wafer production in July is estimated at around 50GW. Some top-tier enterprises have further reduced production midway. Currently, there is strong upward momentum for wafer prices, and wafer profits are expected to recover.

Inventory: Wafer inventories have recently seen a significant decline. Solar cell pick-up enthusiasm has been high in the past week, with substantial market transactions, leading to a corresponding decline in wafer inventories.

Solar Cell

Prices: The price for high-efficiency PERC182 solar cells (with 23.2% efficiency or higher) is 0.26-0.275 yuan/W. Prices fluctuate due to upstream wafer market conditions. Topcon183N solar cells (with 25% efficiency or higher) are traded at 0.23-0.245 yuan/W; Topcon210RN and 210N are traded at 0.24-0.26 yuan/W. Currently, the highest quotes for the three sizes remain at 0.25/0.265/0.265 yuan/W, driving transaction prices up to 0.245/0.26/0.26 yuan/W. HJT30% silver-coated copper (with 25% efficiency or higher) has recently stabilized at 0.35-0.36 yuan/W. Prices have increased due to market demand fluctuations and cost control. HJT direct sales are generally low, with integrated manufacturers being self-sufficient.

Production: The global production schedule for Chinese enterprises in July is 53-54GW, down 3% MoM. Supported by remaining installation rush orders, the overall production cuts are relatively small. The production schedule for 210RN has increased to over 40% of the total TOPCon production.

Inventory: Some enterprises have slowed outflows from warehouses to support price increases. As a result, the market has continued to experience inventory buildup.

PV Film

Prices

PV-grade EVA: The current price for PV-grade EVA is 9,500-9,750 yuan/mt. PV-grade POE is traded at 11,000-14,000 yuan/mt.

PV Film: The current mainstream prices for 420g transparent EVA film are 5.04-5.17 yuan/m², for 420g white EVA film are 5.54-5.67 yuan/m², for 380g EPE film are 4.94-5.02 yuan/m², and for 380g POE film are 6.69-6.84 yuan/m².

Production: The production schedule for PV-grade EVA in July increased by 0.24% MoM, while the production schedule for PV film decreased by 1.87% MoM.

Inventory: Recently, some film enterprises have replenished their stocks, leading to gradual destocking of EVA. Some petrochemical enterprises have switched to maintenance, gradually tightening the overall supply of EVA.

》Check SMM silicon product quotes

》Subscribe to view the historical price trend of SMM metal spot

》Click to view the SMM metal industry chain database

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
16 hours ago
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Read More
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Recent 'EIA' data shows rooftop solar now makes up 20% of Puerto Rico's power capacity (1,456 MW), surpassing natural gas as the second-largest source. Between 2016 and 2025, distributed solar accounted for 81% of all new capacity. To combat frequent grid outages, residents have deployed over 171,000 battery systems (2,864 MWh), with many joining grid operator LUMA's virtual power plant ('VPP') program. Despite this progress, new legislation extended the territory's sole coal plant to 2032 and removed interim renewable targets, though the 100% goal for 2050 remains.
16 hours ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
17 hours ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
17 hours ago
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Apr 3, 2026 09:59
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Read More
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
The US solar industry faces a 53,000-worker shortfall as developers rush to meet the July 2026 construction deadline under the 'OBBBA'. Projections indicate 355,000 workers are needed to hit the 60-70 GW installation targets, yet 86% of employers report hiring difficulties. The labor crunch is compounded by a mandate requiring 15% of labor hours to come from apprentices to secure tax credits. To adapt, developers are building internal training pipelines, targeting veterans, and utilizing digital tools to maximize efficiency.
Apr 3, 2026 09:59
The upward momentum for wafer prices is relatively strong, and the transaction prices of solar cells have risen [SMM Silicon-based PV Morning Meeting Summary] - Shanghai Metals Market (SMM)