Cobalt raw materials imports hit new highs, average price of intermediate products supported cobalt prices

Published: Dec 1, 2020 11:08
According to SMM survey, some of the shipping schedules arriving at ports in September have been delayed to October as crops and other goods occupy the port in South Africa, and shipping schedules and logistics are affected by uncontrollable factors like Covid-19.

SHANGHAI, Dec 1 (SMM) — According to SMM survey, some of the shipping schedules arriving at ports in September have been delayed to October as crops and other goods occupy the port in South Africa, and shipping schedules and logistics are affected by uncontrollable factors like Covid-19.

Cobalt intermediate products imports declined slightly in January-October from 2019. The supply of cobalt sulphate fell 15% in January-October, cobalt chloride supply increased 19% and refined cobalt and cobalt powder output rose slightly. Overall domestic cobalt raw material inventories tightened in January-October. (all YoY basis)

Imports of unwrought cobalt rose in October, but export orders decreased in 2020. Domestic refined cobalt stocks remained high and prices were low. Refined cobalt prices, as the current reference standard for the pricing of cobalt products, have more impact on battery materials prices.

The average price of cobalt intermediate products trended higher in August-October, and the raw material costs at smelters rose, supporting cobalt prices. The average import prices of cobalt intermediate products in October were higher than the domestic spot prices.

Unwrought cobalt inventories tightened,  domestic cobalt raw material stocks tightened YoY

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago