Hefei BYD's annual production capacity of 400000 vehicles has been put on record or construction will start at the end of August.

Published: Aug 4, 2021 16:22
[Hefei BYD's annual production capacity of 400000 vehicles has been put on record or construction will start at the end of August] Hefei BYD Automobile Co., Ltd. has completed the filing of the high-end core parts project of new energy vehicles. After completion, the project has the production capacity of 400000 high-end core components of new energy vehicles, and the project may start construction by the end of August.

A few days ago, it was learned from relevant sources that the high-end core parts project of New Energy vehicles of Hefei BYD Automobile Co., Ltd. has been put on record. After the project is completed, it will have the production capacity of 400000 high-end core components of new energy vehicles. The project may start construction at the end of August.

According to previous reports, the project is a key project for the local area, with a general volume of "4426", that is, "annual production of 400000 vehicles, 4000 mu of land and 2.6 million square meters of building area", which can bring high benefits of "553". That is, "achieve an annual output value of 50 billion yuan, drive 50,000 people to employment, and reach 300000 yuan in tax revenue per mu".

According to the latest announcement, the land is about 3918 mu, 26 new factories, 3 fire pumps and underground pools, 2 comprehensive stations, oil depots, 110KV power stations, departure greenhouses, shipping centers, 2 dangerous and waste warehouses, 2 dangerous chemical warehouses, 2 waste warehouses, 2 logistics centers, comprehensive office buildings, 3 canteens, 4 gatekeepers, recruitment centers, garbage stations, 26 shift buildings, wastewater treatment areas, etc., totaling about 2.3 million square meters.

New production technology of core components such as motor, electronic control, high voltage wire harness and electric assembly, engine assembly, engine cylinder block, brake assembly, public power equipment and piping in the factory building, purchase assembly line, press, welding machine and other equipment, after the completion of the project, it will have the production capacity of 400000 high-end core components of new energy vehicles. 400000 core supporting parts.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
NY Fed's Williams Affirms Steady Rates, Cautions War Risks Inflation and Economic Slowdown
5 hours ago
NY Fed's Williams Affirms Steady Rates, Cautions War Risks Inflation and Economic Slowdown
Read More
NY Fed's Williams Affirms Steady Rates, Cautions War Risks Inflation and Economic Slowdown
NY Fed's Williams Affirms Steady Rates, Cautions War Risks Inflation and Economic Slowdown
New York Fed President Reaffirmed Stance of Holding Rates Steady, but Warned That a Prolonged War Could Simultaneously Push Up Inflation and Weigh on Economic Growth.Williams, President of the Federal Reserve Bank of New York and often referred to as the "third-ranking official" at the US Fed, said Thursday that the current monetary policy stance was "well positioned" to handle the risk of a sustained supply shock that could arise from the war in the Middle East. He warned that the conflict could push up inflation while suppressing economic activity, creating a dual pressure.
5 hours ago
KGHM CEO Seeks Mine Investments in Europe, Morocco to Secure Supply and Cut Costs
5 hours ago
KGHM CEO Seeks Mine Investments in Europe, Morocco to Secure Supply and Cut Costs
Read More
KGHM CEO Seeks Mine Investments in Europe, Morocco to Secure Supply and Cut Costs
KGHM CEO Seeks Mine Investments in Europe, Morocco to Secure Supply and Cut Costs
The CEO of copper producer KGHM stated that the company was seeking to invest in mines in Europe and Morocco to secure ore supply near its Polish smelting base and reduce logistics costs. In addition to its domestic assets in Poland, KGHM also operates the Robinson mine in the US and holds a 55% stake in the Sierra Gorda project in Chile. Last month, the company signed a memorandum on raw material cooperation with Morocco's National Office of Hydrocarbons and Mines and Moroccan mining company Managem Group.
5 hours ago
Pakistan Facilitates US-Iran Talks, Awaits Next Round Date; Hopes for Regional Peace
5 hours ago
Pakistan Facilitates US-Iran Talks, Awaits Next Round Date; Hopes for Regional Peace
Read More
Pakistan Facilitates US-Iran Talks, Awaits Next Round Date; Hopes for Regional Peace
Pakistan Facilitates US-Iran Talks, Awaits Next Round Date; Hopes for Regional Peace
Pakistan's Foreign Ministry spokesperson Andrabi stated that the date for the next round of US-Iran talks had not yet been determined. Andrabi said that Pakistan was playing an important role between the US and Iran. Pakistan's efforts led to the successful conclusion of a ceasefire agreement between the US and Iran, and it was hoped that Lebanon and the region would return to peace.
5 hours ago